UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20211118

2021/11/18 (Thursday)

Previous Day

  • Lab in-personnel: Matt
Status Beginning Run 75.
1K Pot isolated. MB raised. Cryostat vacuum jacket (CVJ) pumped out.
1110 Check contents of warm LN2 Trap 2: 7.5 mbar. Pump out with Scroll Pump.
1140 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.4%
1150 Increase V6 → 12.5% to restart flow
1200 Increase V6 → 12.6% to restart flow
1255 Increase V6 → 12.7% to restart flow
1305 Increase V6 → 12.8% to speed up flow
1355 Stop cleaning through Trap 1 after 135 min. G2 flow pressure was 570-660 mbar. Pump mixture to dump.
Removed 5.4 mbar.

Next Day