UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170418

2017/04/18 (Tuesday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 → gender changer 3/1/2 → DCRC55(1)/33(2)/X(4)
0855 Tower/MC/Coldplate = 33.4/31.0/197 mK, Still = 1.3 K / 0.110 mbar, G1/G2 = 254/239 mbar, 1K Pot = 1.695 K / 30 mbar. Main Bath = 69.6%. Boil off rate: close to slow mode (predicted level: 71.7%)
0902 Fill LN2 cold trap full.
1213 Removing south lead shield wall for NaI mounting. Notice that tower temp has a small spike and rose from 33.5 mK to 34.1 mK. Perhaps we bumped the cryostat and caused a slight touch.
1709 Finish IbIs on DCRC1pB.
1714 Fill LN2 cold trap.
2208 Finish IbIs on DCRC4pB.

Next Day