2017/07/30 (Sunday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
1230 Fill LN2 cold trap full.
1245 Tower/MC/Coldplate = 26.1/29.9/174 mK, Still = 1.4 K / 0.055 mbar, G1/G2 = 150/134 mbar, 1K Pot = 1.68 K / 24 mbar. MB = 24.4%
1259 Start LHe transfer (MB = 24.4%)
1354 End LHe transfer (MB = 91.8%)
1410 Release pressure from MB.
1513 Linux machines were all unresponsive both locally and remotely since yesterday afternoon. Hard reboot jiajin and denali.
Now they seem to be responsive.
1550 cdms2 is working, but the MidasDAQ is completely down. None of the processes are running.
1554 Upon restarting the DAQ, it resumed the sequence from yesterday. Manually end the sequence. Luckily it was in the middle of a cool down, so no biases or LEDs were enabled.
1602 All channels look good in pulse viewer still.
1605 Begin 2-hour bake
1927 Start sequence 12 60-minute data series of data with Frontend Gain = (15/2)/(4/4)/(5/5/5/5), OG = 4/2/4, QET biases = 2V setting from 2017/07/25, with 1000 beginning randoms, NO FLASHING, and a 15ADC bin threshold trigger on DCRC4pB (Side2pF). Charge biases are DCRC1/2 (Side2/1) = +2/-2 V