UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180313

2018/03/13 (Tuesday)

Previous Day

Status: warming. Main bath empty. LN2 traps pumped out, mixture in dump. 1K Pot evacuated and isolated. Cryostat vacuum jacket pumping overnight.
0955 Turbo (on cryostat vacuum jacket) = 30 nbar, cryostat vacuum jacket = 300 nbar with pump valved out.
0955 MC(Cernox) = 280 K
1105 Finish lowering main bath and deinstalling tower
need to investigate the 77K short from DIB2 qI FET gate to chassis.
1130 Disassembling tower. Examine ST-3-10 from DIB2, and also Tower Face 4. Take off cover plates to see how Wire 15 is seated in its trench, push on it some with the black plastic tool to check the tension. No discernible difference between Wire 15 and other wires. Tower wires seem to have more tension than side coax wires.
1153 Unscrew spool bottom and rotate spool and detector to align DIB1 with tower facce 6 and DIB2 with tower face 3.
1200 Install Side Coax ST-3-3 / ST-3-8 on DIBs 1 / 2
1205 Tower electrical checkout:
Detector USD1 DIB 1
side coax ST-3-3 date/who: 2018-03-13/NM&MF
face 6
+ lead -lead signal typical measured
9 chassis LED1 Rforward 8 to 9 MΩ 780kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.107V
chassis 9 LED1 Rreverse <1 nS <1 nS
10 chassis LED2 Rforward 8 to 9 MΩ 781kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.107V
chassis 10 LED2 Rreverse <1 nS <1 nS
11 7 Qo Rbias 24 to 26 nS 25 nS
11 12 Qo C coupling <1 nS <0.3 nS
13 12 Qo Rfeedback 24 to 26 nS 25 nS
14 7 Qi Rbias 24 to 26 nS 25 nS
14 15 Qi C coupling <1 nS <1 nS
16 15 Qi Rfeedback 24 to 26 nS 25 nS
1-8, 11-16 chassis Chassis shorts <1 nS <1nS
Detector USD1 DIB 2
side coax ST-3-8 date/who: 2018-03-13 / MF&NM
face 3
+ lead -lead signal typical measured
9 chassis LED1 Rforward 8 to 9 MΩ 760kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.11V
chassis 9 LED1 Rreverse <1 nS 1.5 nS
10 chassis LED2 Rforward 8 to 9 MΩ 780kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.11V
chassis 10 LED2 Rreverse <1 nS <0.5nS
11 DIB1-7 Qo Rbias 24 to 26 nS 25 nS
11 12 Qo C coupling <1 nS <.2nS
13 12 Qo Rfeedback 24 to 26 nS 25 nS
14 DIB1-7 Qi Rbias 24 to 26 nS 25 nS
14 15 Qi C coupling <1 nS <1 nS
16 15 Qi Rfeedback 24 to 26 nS 25 nS
1-8, 11-16 chassis Chassis shorts <1 nS <1nS
1220 Finish tower reassembly. Move tower from clean room to fridge clean tent.
1310 Begin installing tower
1340 Check pressure in 4He cold trap: 2.0 mbar. Pump out with scroll pump.
1340 Check pressure in fridge: Condenser = 2.5 mbar, Still = 2.3 mbar. Pump out with scroll pump.
1420 SQUET attached on DIB2. Electrical check: looks good.
1435 SQUET attached on DIB1. Electrical check: looks good.
1440 Check pressure in warm LN2 Cold Trap 1 (the one we used during the run): 11.2 mbar. Pump out with scroll pump.
1445 Check pressure in warm LN2 Cold Trap 2: 7.0 mbar. Pump out with scroll pump.
1505 IVC closed and mostly tightened. Start pumping gently on IVC with scroll pump
1530 Switch to pumping IVC with turbo pump
1535 Fill LN2 cold trap bath
1540 Start cryocleaning mixture through Cold Trap 2, V6 = 12.4%
1555 Increase V6 to 12.7% to reestablish flow
1605 Increase V6 to 12.8% to speed up flow
1620 Leak check IVC. Some leaks found in the plumbing at the top of the fridge behind the Ebox. A number of KF clamps were somewhat loose - tightened these, then saw no leaks. LD background 180 pbarL/s.
1555 Increase V6 to 13.0% to reestablish flow
1650 Stop cryocleaning. Pump mixture back to dump.
1700 Retighten IVC screws
1710 Raise main bath
1720 Open mixture to LN2 Trap 1 through V9 and V13a to let it chill overnight

Next Day