UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220520

2022/05/20 (Friday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
1350 MC/Coldplate = 28.5/145 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 98/114 mbar, 1K Pot = 18° / 1.56 K / 8.5±1 mbar, MB = 37.5%
1350 Fill LN2 cold trap bath
1524 Begin LHe transfer @ MB = 35.5%
1600 End LHe transfer @ MB = 93.9%

Next Day