UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20231102

2023/11/02 (Thursday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 78 beginning. DCRCs are kept ON.
1300 DCRCs are turned off to debug the issues
1400 Refill LN2 140L dewar
1500 Tower(U28)/MC(H35)/Coldplate = 73/40.4/145 mK, Still(P1) = 1.41 K / 0.11 mbar / 0 mW, G1/G2 = 151/143 mbar, 1K Pot(P2) = 37.5° / 1.65 K / 28 mbar, MB = 57.9%
1520 Fill LN2 cold trap from dewar

Next Day