UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230223

2023/02/23 (Thursday)

Previous Day

* Lab in-personnel: Zach

Status Run 77 in progress.
Setup Cable 2/1/3 → diverter/nothing/nothing → DCRC50(3)/DCRC55(1)/DCRCX(4)
1514 Tower(RoX)/Tower(U28)/MC(H35)/Coldplate = -/48.1/31.7/151 mK, Still(P1) = 1.15 K / 0.12 mbar / 0 mW, G1/G2 = 170/156 mbar, 1K Pot(P2) = 45° / 1.66 K / 30 mbar, MB = 29.4%
1516 Fill LN2 cold trap dewar
1525 Begin LHe transfer @ MB = 29.0%
1532 LN2 dewar ran out, the cold trap dewar should have enough till tomorrow morning though

Next Day