2023/02/23 (Thursday)
* Lab in-personnel: Zach
| Status | Run 77 in progress. |
|---|---|
| Setup | Cable 2/1/3 → diverter/nothing/nothing → DCRC50(3)/DCRC55(1)/DCRCX(4) |
| 1514 | Tower(RoX)/Tower(U28)/MC(H35)/Coldplate = -/48.1/31.7/151 mK, Still(P1) = 1.15 K / 0.12 mbar / 0 mW, G1/G2 = 170/156 mbar, 1K Pot(P2) = 45° / 1.66 K / 30 mbar, MB = 29.4% |
| 1516 | Fill LN2 cold trap dewar |
| 1525 | Begin LHe transfer @ MB = 29.0% |
| 1532 | LN2 dewar ran out, the cold trap dewar should have enough till tomorrow morning though |