| 1020 | MC(cernox) = 6.1 K, 1K pot = 7.0 K, Sorb = 9.4 K, G1 = 551.8 mbar, MB = 38.6% |
| 1035 | Start LHe transfer. (38.6%) |
| 1100 | Fill LN2 cold trap full. |
| 1203 | Transfer is going quite slow (71.4%). It could be because the recovery system is doing something strange. The He leak alarm in the recovery room has been going since yesterday, though Paul Crowell has said that he checked for leaks and there isn't one. Maybe the system is at a higher pressure than normal and that's somehow slowing the transfer. |
| 1217 | Cease LHe transfer (74.6%) |