2016/10/13 (Thursday)
| Status: LN2 transferred yesterday, in bath overnight. LN2 cold traps empty and cold. | |
| 0835 | Remove Cf source from the IVC and return source to safe |
| 0840 | MC(Cernox) = 77 K and flat, IVC = 1.4 mbar. Sorb = 121 K, slowly increasing |
| 0845 | Begin scroll pumping, then turbo pumping, IVC |
| 0850 | Turbo pump = 54 nbar, IVC = 460 nbar |
| 0910 | Turbo pump = 14 nbar, IVC = 120 nbar |
| 0915 | 77K electrical check with the following issues: |
- DIB3 qI feedback to chassis has high leakage, 26 nS
- DIB4 SQUID bias B to return has high and somewhat unstable resistance, 90 kΩ (normal is 1-2 kΩ). Unfortunately this is a Side 1 channel, TES1.
This is SQUET ST-3-10, last used on G106a DIB2 in Run 59
Also cross-channel checks:
| DIB1 | QET A-B-C = 700-900 kΩ, A,B,C-D = 0.4-0.7 nS. Note that pA,B,C are Side 1, pD is Side 2. |
|---|---|
| DIB3 | QET B-C = 0.7 nS. Note pB is Side 2, pC is Side 1. |
| DIB4 | QET C-D = 1300 kΩ, C,D-B = 0.4 nS. Note that pB is Side 1, pC,D are Side 2. |
| 0920 | Try pumping IVC with LD, signal is >500 pbarL/s, pretty high. Go back to turbopumping. |
|---|---|
| 0945 | Turbo pump = 8.6 nbar, IVC = 86 nbar |
| 1010 | Turbo pump = 7.4 nbar, IVC = 63 nbar |
| 1020 | Isolate turbopump, and switch to leak checker. Background leak rate stabilizes at 290 pbarL/s. Getting better. Switch back to pumping with turbopump. |
| 1050 | Turbo pump = 7.4 nbar, IVC = 86 nbar. Switch to leak checker. Background leak rate stabilizes at 190 pbarL/s. Switch back to pumping with turbopump. |
| 1135 | Switch to leak checker. Background leak rate stabilizes at 140 pbarL/s. Isolate leak checker to check IVC pressure. IVC = 74 nbar. Switch back to pumping with turbopump. |
| 1213 | Turbo pump = 6.3 nbar, IVC = 100 nbar. Switch to leak checker. Background leak rate stabilizes at 120 pbarL/s. Switch back to pumping with turbopump. |
| 1254 | Begin taking test series of data with signal generator on DCRC55 to look for trace glitches. |
|---|
| 1305 | Background leak rate = 99 pbarL/s. We just gotta do it. Commence LN2 blowout. |
|---|---|
| 1310 | Use blown out LN2 to fill LN2 cold trap full. |
| 1400 | Commence cryocleaning mixture through cold trap 1 in preparation for throughput test. |
| 1405 | LN2 blowout finished. Let hose thaw, and cease He gas flow through IGH. Leak rate dropped to 85 pbarL/s during blowout. No sign of leak. |
| 1410 | Pump and flush main bath with He gas. |
| 1430 | Cease cryocleaning mixture. Pump mix to dump. |
| 1445 | Pump out and backfill 1K Pot with He gas. |
| Will use July 12 procedure to perform throughput test: |
- All mixture in dump, LN2 traps cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2.
- Close V12a+speedivalve and V3, open V1
- monitor G1
| 1450 | Throughput looks good. G1 reaches maximum of 660 mbar before Step 3, then falls to minimum of 105 mbar, then rises at 57 mbar/min. Same as Sept 15th. Leak rate drops from 77 pbarL/s to 76 pbarL/s during throughput test. No sign of leak from fridge lines. |
|---|---|
| 1455 | Pump mixture back to dump in preparation for cold trap cleaning. |
| 1510 | Commence LHe transfer (-1.0%). Open He recovery lines. |
| 1515 | Fill IVC with 4.6E-2 mbar of He exchange gas. |
| 1520 | Commence cryocleaning mixture through cold trap 1. |
| 1600 | MC(Cernox)/Sorb = 70/92 K |
| 1630 | MC(Cernox)/Sorb/1K Pot = 57/8.2/6.7 K, IVC = 7.4 μbar, MB = 8% |
| 1700 | MC(Cernox)/Sorb/1K Pot = 45/7.0/5.5 K, IVC = 6.3 μbar, MB = 2.5%. Previous bath level was maybe a spurious reading. 1K Pot and Sorb temperatures reached minima but then bounced back a bit higher, not sure whether that's related. |
| 1730 | MC(Cernox)/Sorb/1K Pot = 33/5.7/4.6 K, IVC = 1.4 μbar, MB = 33% |
| 1755 | Cease cryocleaning mix. Pump to dump. |
| 1816 | Had to switch He gas cylinder. Will order another new one tomorrow. Bath level at 66.4%. |
| 1830 | Cease LHe transfer (61.3%). The dewar must have run out of liquid just as I reintroduced He gas, so I mistook the lowering level for temporary boil off. |
| 1835 | MC (Cernox) = 12K. IVC = 630 nbar. Commence turbopumping on IVC. |
| Place Cf source on side of fridge at detector height. |