1700 Check contents of warm LN2 Trap 1: 20.2 mbar (22.5 on G1). Pump it out with the scroll pump.
1710 G1 = 2.8 mbar and stable, stop pumping on Trap 1
1715 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1730 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1801 Open V6 to 11.5% to restart flow
1814 Open V6 to 11.9% to restart flow
1832 Checked that G2 pressure increase was reasonable. Kept V6 at 11.9%
1842 End cryocleaning mixture through trap 1. Pump mixture to dump
1858 P1 = 0.007 mbar, G1 = 1.9 mbar and stable. Close all valves and turn off 3He pump, leaving 710.3 mbar in dump
1901 Remove cold trap 1 from the LN2 bath to warm up overnight