2024/07/16 (Tuesday)
- Lab in-personnel: Himangshu
| 1130 | First Cryocleaning with manual GHS yesterday. |
|---|---|
| 1223 | Cold Trap 1: 200 mbar. Pump out with scroll pump. |
| Check contents: Open Cold Trap 1 regulator valves, Open V15 and V3. Note down G1. Start scroll pump.Open scroll pump regulator valve, 5A, 2A and then V4. Wait till P2 drops to 10e-1 level. |