| Status | Run 76 finished |
| Setup | DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| | IVC closed and Turbo pumping for a while. No tower - this was just for a leak test. |
| 1300 | Soldered 4 wire connection to new RoX Ruthenium Oxide thermometer |
| 1400 | Obtained the 2d motor testing equipment from Scott's office |
| 1500 | Connected the Y axis of the 2D source mover to the PCB board using pins (did not solder). |
| 1540 | Move one of the small Am241 pellets from the safe into the clean room |
| 1600 | Prepare setup to test how the movement of the 2D source mover changes with resistance |
| 1610 | Try to install Am241 pellet source in the 1D source mover carriage. The diameter of the carriage is a little large, so add some layers of kapton tape. However the carriage is not deep enough to hold both the pellet source and the collimator disk, they stick out a few mm, I could maybe use a longer screw and some tape to mount the carriage. |
| | |