2017/08/10 (Thursday)
| Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4) | |
| 0907 | Tower = 25.8 mK, Still = 0.055 mbar, G1/G2 = 137/131 mbar, 1K Pot = 1.69 K / 30 mbar. MB = 38.0% |
| 0910 | Fill LN2 cold trap bath |
| 1318 | Begin LHe transfer @ MB = 31.6% |
| 1342 | Finish LHe transfer @ MB = 55.5%. We did a partial transfer because we intend to end the run tomorrow and begin warming. |
| 1744 | Fill LN2 cold trap full. |