2022/11/01 (Tuesday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe behind lead wall on W side of fridge.
NaI array trigger thresholds: 7.0 - 11.0 MeV
Warmed up two days ago for nineteenth 5K pumpout. Left IVC valves closed overnight.
1005 Check pressure in IVC: 10 nbar. Close IVC valves again.
1005 MC/1KPot/Sorb = 5.24/6.91/8.8 K
1005 Turn on 4He pump. Open Recovery valve to 4He pump. Pump out line to 1K pot (speedivalve closed). Check pressure in 1K Pot (with V4a open, 4He pump inlet valve closed). 1K Pot = 0.23 bar on mechanical gauge.
1010 Pump out 1K Pot slowly, throttling the flow at the valve at the pump inlet, opening just until the pump gets louder, then waiting, then opening a little more, etc. With pump just a little loud, can see pressure go down at the mechanical gauge. When this is low, open valve a bit more. When P2 gets below 20 mbar open valve all the way.
1015 4He pump valve open all the way.
1015 1K Pot = 3.39 K / 2.4 mbar. G1 (fridge+dump) has fallen from 544→529 mbar. MC has fallen from 5.24→5.22 K.
1015 Open 1K Pot needle valve → 15°. 1K Pot → 3.11 K / 5.5 mbar
1020 Open 1K Pot needle valve → 30°. 1K Pot → 2.92 K / 7.0 mbar
MC drops quickly from 4.8 → 3.4 K
1030 Open 1K Pot needle valve → 45°. 1K Pot → 2.58 K / 9.5 mbar
1040 Fill LN2 cold trap bath
1055 MC/Still/1KPot = 2.98/2.78/2.29. G1(fridge+dump) = 270 mbar and falling.
1215 MC/Still/1KPot = 1.89/1.92/1.54. G1(fridge+dump) = 49 mbar and pretty flat.
1215 Close V3 and V9, leaving 47 mbar mixture in dump (G2)
1215 Turn on 3He pump. G1(condenser) → 60 mbar
1220 Start circulation through Trap 1. V6 → 12.6%. Condenser peaks at 301 mbar. MC(H35) → 1.35 K. Still → 1.39 K / 11 mbar
1225 V6 → 13.0%. Condenser(G1) peaks at 234 mbar. MC(H35) → 1.13 K. Still(P1) → 1.19 K / 4.5 mbar.
1227 Begin LHe transfer @ MB = 47.6%
1230 1K Pot = 1.67 K / 24 mbar
1230 V6 → 13.4%. Condenser(G1) peaks at 188 mbar. MC(H35) → 1.13 K. Still(P1) → 1.14 K / 3.0 mbar.
MC wiggled between 1.11 and 1.15 K, going through Al transition
1235 V6 → 13.8%. Condenser(G1) peaks at 157 mbar. MC(H35) → 0.85 K. Still(P1) → 1.07 K / 1.6 mbar.
1240 V6 → 14.4%. Condenser(G1) peaks at 147 mbar. MC(H35) → 0.57 K. Still(P1) → 1.07 K / 0.8 mbar.
1245 V6 → 15.0%. Condenser(G1) peaks at 146 mbar. MC(H35) → 0.42 K. Still(P1) → 1.07 K / 0.55 mbar.
1250 V6 → 100.%. Condenser(G1) peaks at 144 mbar. MC(H35) → 0.17 K. Still(P1) → 1.05 K / 0.14 mbar.
1255 1K Pot = 1.53 K / 8.5±0.5 mbar.
1305 MC = 68 mK. Still = 1.05 K / 0.12 mbar. G1/G2 = 124/126 mbar. 1K Pot = 1.52 K / 7.5±0.5 mbar.
1305 Open V14 to pull the rest of the mixture out of the dump into circulation. Still peaks at 80 mbar, Condenser peaks at 182 mbar, MC peaks at 111 mK, then all relax again. 1K Pot mostly unaffected.
1309 End LHe transfer @ MB = 92.9%
1330 Still = 0.80 mbar. Close V14
1355 MC = 28.7 mK
1505 MC = 27.3 mK. Cold!
1510 Plug in DCRCs 1&3
1520 Check phonon channels. Relock most of them, then baselines return to around -0.8 V. Adjust offsets to target -0.80 V baselines. But it seems to be a moving target because the MC is warming now that the DCRCs are running.
1525 MC = 28.5 mK and still rising a bit.
1550 MC = 28.9 mK and flattening.
Fine tune offsets to get all phonon baselines near -0.80 V