2020/10/15 (Thursday)

Previous Day

  • Lab in-person: Matt, Michael
  • Virtual partner: none
Setup Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs on. Lead/poly shield erected (4 lead walls, 2 poly walls).
0725 MB = 37.5%
0810 Tower = 57.5 mK. Fairly constant at the moment, within about 0.1 mK
0820 Matt Fritts body temperature = 97.3 F
0902 Tower = 57.4 mK, QET biases = (0, 270, 325, 0)/(0, 345, 350, 370)uA
0906 Start a 60 min series at HV = +10V, drifting 0.0203 V/s, prebias 15% for 2min,
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = see above&below, Front-End Gains = (3/3/3)/(5/5/5)
1000 BOR & 5 Hz in-run randoms, trigger on DCRC1pD threshold = 8
Use RootSequencer.c, function drift_sequence(10,0.0203)
Prebiasing algorithm didn't really work at this low bias… RootSequencer set prebias to 11.5V, actually lower than the targeted drift start of 12.7V. Should look into the code, see what went wrong.
0906 Vtest = 0.23 mV shortly after drift begins. Drift appears to start at 11.7 V. 0.79% HV loss
0908 Tower = 57.6 mK, QET biases = (0, 265, 325, 0)/(0, 345, 345, 370)uA
0918 Tower = 57.8 mK, QET biases = (0, 265, 325, 0)/(0, 340, 345, 365)uA
1006 Drift ends, no apparent lag. Vtest = 0.69 mV. HV at end of drift looks like 84.7 V, indicating 0.32% HV loss
Looks like drift was not fast enough
1000 Michael arrives in lab. Body temp 98.4
1010 Tower/MC/Coldplate = 57.8/46.6/195 mK, Still = 1.49 K / 0.120 mbar / 0 mW, G1/G2= 226/209 mbar, 1K Pot = 1.63 K / 22±2 mbar.
1015 Incomplete fill of LN2 cold trap. LN2 dewar empty.
1035 Matt enters lab
1116 Begin LHe Transfer at MB = 31.1%
1148 End LHe transfer @ MB = 90.3%
1205 Attend SCDMS group meeting
1250 Switch HV leads to negative polarity
1300 MB = 90.3%
1315 Fill LN2 cold trap bath from freshly refilled Dewar
1315 Matt and Michael leave lab
1535 Write a ROOT macro to update the QET biases based on the current Tower temperature.
/home/hep/cdmssoft/scdmsDAQ/MidasDAQ/online/scripts/rootsequencer/QETbias_update.c.
This macro will read the most recent Tower temperature from the log written to /chocula. The macro has the optimal-QET-bias-versus-temperature functions that I derived from IbIs for each channel. The function update_QETbiases() will read the temperature and write the appropriate QET biases to the ODB, one time. The function sequence_update_QETbiases(int duration_min, int repeat_sec) will run for a duration in minutes set by the first argument and will update at intervals in seconds set by the second argument.
1545 Tower = 61.6 mK. Has wandered up from around 58.0 mK an hour ago.
1550 Check phonon channels, relock DCRC4pB
1603 Start a 60 min series at HV = -300V, drifting 0.0305 V/s, prebias 15% for 2min,
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = set automatically to track temperature, Front-End Gains = (3/3/3)/(5/5/5)
1000 BOR & 5 Hz in-run randoms, trigger on DCRC1pD threshold = 8
Use RootSequencer.c, function drift_sequence(300,0.0305)
Use QETbias_update.c, function sequence_update_QETbiases(70,30)
1603 Vtest = -2.4 mV shortly after drift begins. Rootsequencer says drift starts at -315.6 V. 0.30% HV loss.
Tower temperature started around 61.8 mK and fell steadily to 59.8 mK during series. The QETbias updater increased the DCRC1pD bias from 341 to 347 uA, for example.
1704 Vtest = -3.0 V at end of drift. HV = -425.4 V according to RootSequencer. 0.28% HV loss.
Drift was too slow.
1805 Tower = 60.5 mK, looks like it's done cooling after flash.
1813 Start a 60 min series at HV = -100V, drifting 0.0285 V/s, prebias 15% for 2min,
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = set automatically to track temperature, Front-End Gains = (3/3/3)/(5/5/5)
1000 BOR & 5 Hz in-run randoms, trigger on DCRC1pD threshold = 8
Use RootSequencer.c, function drift_sequence(100,0.0285)
Use QETbias_update.c, function sequence_update_QETbiases(70,30)
1813 Vtest = -0.6 mV shortly after drift begins. Drift starts at -108.3 V. 0.22% HV loss.
Tower temperature started around 60.4 mK and fell steadily to 59.8 mK during series.
1914 Vtest = -1.2 V at end of drift. HV = -210.6 V. 0.23% HV loss.
This data series was not written. Logger must have been turned off. I could be that I had the pulseviewer going so that a new series was not started.
2010 Tower = 60.3 mK, seems to be done cooling mostly
2017 Start a 60 min series at HV = -10V, drifting 0.0220 V/s, no prebias,
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = set automatically to track temperature, Front-End Gains = (3/3/3)/(5/5/5)
1000 BOR & 5 Hz in-run randoms, trigger on DCRC1pD threshold = 8
Use RootSequencer.c, function drift_sequence(10,0.0220,3600,0,0)
Use QETbias_update.c, function sequence_update_QETbiases(70,30)
2017 Vtest = -0.06 mV shortly after drift begins. Drift starts at -11.8 V. 0.20% HV loss.
2025 Temperature not very stable. Seeing lots of spiky noise triggers. Increase trigger threshold 8→16
Still pretty many noise triggers, Increase trigger threshold 16→24
2030 Temperature rising, DCRC4 channels railed. This data is garbage.
2031 Abort series. Stop series on MIDAS page. Then stop RootSequencer. Check DCRC2qI then use changeq() to step it to 11.59 (0V) in 35 1-second steps. Set Logger/Write Data to n.
2035 Relock all the channels
2040 Double-click Create_Arduino_Bridge. Monitor on Arduino Editor browser tab indicates communication established with source mover motor. Type “help” to verify. Tower temperature spikes to 1.5 K then falls, maybe just creating the bridge? not sure.
2045 Check dwell on Arduino: 15 ms. Change dwell to 40 ms.
2048 Move source -4×46 steps with 4 minute pause after each move, mvNwait -4 240 46
This should move the source to y = -24.077 mm warm (-23.974 mm cold, after correction for differential contraction). This is well into pD territory. Total sequence should take 3hr 4min, ending at 23:52.
2050 First move only caused the Tower temperature to go up from 0.140 to 0.145 K. Seems like something must be wrong…
2053 Second move caused a heating from 0.10 to 0.12 mK. Strange. (Normal peak is 1.1 K)
2057 Third move caused a heating from 0.096 to 0.11 mK.
2114 Last three moves all cause peaks at a little over 0.10 K, falling to a little below 0.09 K between. 10× lower than normal.
I wonder if I correctly reset the dwell from 15 ms to 40 ms. The output shows “wr dwell = 40”. Does that mean I typed that = sign in? If so it probably didn't take. Or it may have been set to zero. Crud.
2115 Matt Fritts body temperature = 97.6 F

plan after this mvNwait finishes at 11:53:

  1. do “rd dwell”. If it's 40, then dunno what's happening - just try taking data. If 15 or 0 then:
  2. do mvNwait 4 15 46. This should reverse whatever was done before. Should only take 11.5 minutes (shouldn't matter, no overheating problem)
  3. do “wr dwell 40”
  4. do “mvNwait -4 240 46”
2400 “rd dwell” shows 0. oops.
try “mv +4”. Tower peaks a little above 80 mK, similar to the -4 step moves
2405 do “mvNwait +4 15 2”. Tower peaks around 96 mK.
do “mvNwait +4 30 2”. Tower peaks around 102 mK.
2410 do “mvNwait +4 15 3”. Tower peaks around 119 mK.
2415 do “mvNwait +4 25 3”. Tower peaks around 115 mK.
do “mvNwait +4 30 5”. Tower peaks around 125 mK.
2423 do “mvNwait +4 40 30”. Peaked around 125 mK.
OK, if it moved at all, it should be “undone” now.
2445 do “wr dwell 40”. do “rd dwell”, it returns 40. OK good.
2448 Move source -4×46 steps with 4 minute pause after each move, mvNwait -4 240 46
This should move the source to y = -24.077 mm warm (-23.974 mm cold, after correction for differential contraction). This is well into pD territory. Total sequence should take 3hr 4min, ending at 3:52 am.
Tower peaks at 1.0 K after first move. OK good.

Next Day