UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210711

2021/07/11 (Sunday)

Previous Day

  • Lab in-personnel: Gabe, Pramod
Status Run 74 in progress. First cooldown after IVC rebuild.
Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels.
Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. No lead/poly shield. Currently DCRC55(1) is disconnected and off, Cable 3 plugged into source mover board only.
1632 Fill LN2 cold trap bath.
1633 Tower/MC/Coldplate = 146/33.3/189 mK, Still = 1.34 K / 0.070 mbar / 0 mW, G1/G2= 231/211 mbar, 1K Pot = 1.63 K / 21±1 mbar. MB = 23.6%
1659 Start LHe Transfer @ MB = 23.3%
1732 End LHe Transfer @ MB = 87.0%

Next Day