| Status | Run 74 in progress. First cooldown after IVC rebuild. |
| | Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels. |
| | Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. No lead/poly shield. (DCRCs on overnight - currently source mover board is disconnected) |
| 1320 | LN2 Dewar is empty. Fill that from station upstairs. Will start LHe transfer once that is finished. |
| 1332 | Tower/MC/Coldplate = 121/31.8/189 mK, Still = 1.34 K / 0.075 mbar / 0 mW, G1/G2= 224/209 mbar, 1K Pot = 1.63 K / 20±2 mbar. MB = 26.2% |
| 1400 | Noticed dewar vent valve was stuck during fill caused, it to move slowly. Closing and re-opening the valve seems to have fixed the issue. |
| 1448 | Fill LN2 cold trap bath. |
| 1510 | Begin LHe transfer, MB = 22.9% |
| 1546 | End LHe transfer, MB = 85.6% |