2017/07/04 (Tuesday)
| Setup: DIB1 → 3.2 MHz filters 1 → cable 1 → gender changer 1 → DCRC55(1) | |
| 1323 | Lab = 21.9 C, 46% humidity |
| 1325 | Tower/MC/Coldplate = 28.6/30.6/180 mK, Still = 1.2 K / 0.060 mbar, G1/G2 = 107/103 mbar, 1K Pot = 1.73 K / 45 mbar. MB = 26.7% (predicted level: 31.6%) |
| 1325 | Fill LN2 cold trap bath |
| 1345 | Start LHe transfer (MB = 26.1%) |
| 1500 | End LHe transfer (MB = 91.4%) |