UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20201118

2020/11/18 (Wednesday)

Previous Day

  • Lab in-person: Matt
  • Virtual partner: Ruiren, Derek
Status Run 73 deinstallation. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. Cryostat vacuum jacket pumped out. IVC at 1 bar. MB in pit, clean tent erected.
1500 Matt enters lab
1500 MC(Cernox) = 297.1 K
1530 Check HP desk multimeter for 4-wire resistance measurements. We want to use this to test solder connection resistances at 4K with electroplated NbTi. Looks like with shorted banana cable it can read resistances as low as a few mOhm.
1610 Matt leaves lab.

Next Day