UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190710

2019/07/10 (Wednesday)

Previous Day

Setup DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer ?/3/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)
DCRC33(2) → 1kV power supply → HV input

Three walls of the lead/poly shield are up.
0854 Tower/MC/Coldplate = 38.5/29.4/184 mK, Still = 1.18 K / 0.18 mbar / 6 mW, G1/G2 = 204.8/199.9 mbar, 1K Pot = 1.614 K / 19 mbar. MB = 34.8%
0905 Fill LN2 Coldtrap bath from bomb dewar.
1512 Begin LHe transfer. MB=25.4%.
1520 Refill bomb dewar from transfer dewar
1550 When removing the rubber hose from the bomb dewar, the hose cracked and shattered
1601 End LHe transfer. MB=89.8%.
1610 Fill LN2 cold trap bath from transfer dewar.

Next Day