| Status | Warming. All mixture in dump. LN2 traps warm. 1K Pot needle valve open. Nitrogen exchange gas in IVC. Nitrogen and helium exchange gas in cryostat vacuum jacket for fast warmup. |
| 1440 | The purge gauges look fine in the purge cabinets, looks like the nitrogen problem isn't affecting our clean room too much. All gauges read above 5 of whatever unit they are measuring. |
| 1445 | Plug in scroll pump and begin pumping out vacuum jacket, turbo pump reads 1 mb. |
| 1530 | Turbo pump reaches 5.4e-2 mb, open turb pump valve to continue pumping on vacuum jacket, close valve on scroll pump and unplug it. |