2019/03/26 (Tuesday)
| Setup | DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC50(3) DCRC33(2) → 1kV power supply → HV input Lead poly shield is erected, N/E/W walls complete, no poly or lead on S wall. PuBe source present in paraffin barrel behind lead stack. |
|---|---|
| 0920 | Tower/MC/Coldplate = 43.0/31.5/200 mK, Still = 1.85±0.15 K / 0.160 mbar, G1/G2 = 265/234 mbar, 1K Pot = 1.79 K / 15 mbar. MB = 32.8% |
| 0935 | Fill LN2 cold trap bath |
| 1015 | Notice that MIDAS crashed again, apparently during the end of the sequence last night during the wait after flash. Again mhttpd failed. Did another restart without killing anything, mhttpd is back and all looks normal. |
| 1040 | Generate some sequences to test leakage. Currently we are not purging the Ebox. We'll start with that, then try with Ebox purge, then if that's still bad try disconnecting various things. |
| 1047 | Start sequence to dial up HV from 0 to 400V at 1 V/s. |
| 1057 | at 10:57:10, HV hits 300 V |
| 1100 | at 11:00:30 HV hits 398.8 V, max |
- from around 143 V to 224 V, Vtest was mostly flat at around 80 mV. Then it starts to rise again.
- At 342 V, Vtest had risen to about 96 mV, then starts rising much faster
- At the maximum, 400 V, Vtest reached around 165 mV. Then as we left it at that voltage Vtest wandered a bit, between 150 and 180 mV.
| 1112 | Start sequence to dial HV back to 0 V |
|---|---|
| 1117 | Start purging Ebox with N2 from the LN2 Dewar vent. Opened it just enough to feel some pressure on my thumb when I held it over the port. |
| 1137 | At 11:37:20, start sequence to dial up HV from 0 to 400V at 1 V/s. |
| 1147 | At 11:47:03, HV hits 289.9 V |
| 1150 | Just as sequence finishes at 398.8 V, leakage jumps from 150 mV to 800 mV. At this same time, tower temperature starts rising suddenly. Goes from 43 mK to 47 mK in 3 min |
| 1151 | Start sequence to dial HV back to 0 V. |
| 1156 | Leakage is decreasing linearly from 800 mV, currently 450 mV. This is much higher than the max reached in the first voltage scan today. Tower temp = 48.8 mK. Still and circulation pressures are all elevated. G1/G2 = 288/256 mbar, Still=0.190 mbar |
| 1205 | HV = 0 V |
| Before this severe increase in Vtest and Tower temperature, Vtest versus HV was behaving about the same as in the previous test, so purging the Ebox didn't seem to matter much. | |
| 1206 | Take a look at detector channels on pulse viewer. Some are railed, but those that aren't still show pulses. No obvious oscillatory modes, but jagged breakdown noise present. |
| 1215 | Vtest is stable but Tower temperature is still elevated, flattish at 53 mK. |
| 1215 | Turn off DAQ programs. Then power down DCRC50(3). After half a minute Tower temperature starts falling. |
| 1245 | Tower = 42.5 mK, colder than it was this morning even. |
| 1247 | Begin LHe transfer @ MB = 27.6% |
| 1334 | Cease LHe transfer @ MB = 93.1% |
| 1340 | Tower stable at 42.7 mK |
| 1342 | Power down DCRC4. Disable DCRCs 3,4 in ODB. Unplug detector cables and pi filters from ebox. |
| 1345 | We want to locate the HV leakage location. Now we've got HV connected to the HV board and board connected to cables with DCRCs 3,4 connected, but powered down. DCRC2 is still controlling the HV. |
| 1348 | Start dcrc_driver01. |
| 1349 | At 13:49:15 start sequence to dial up HV from 0 to 400V at 1 V/s. |
| 1352 | At 13:52:39, HV hits 100 V. |
| 1356 | At 13:56:00, HV hits 200 V. |
| 1400 | Tower has been falling since powering down DCRC4 and unplugging the cables. Now Tower = 40.7 mK. |
| 1402 | At 14:02:37, HV hits 398.8 V, max. Didn't see the leakage rate reach as high a level as with the cables plugged in. |
- from around 100 V to 185 V, Vtest was mostly flat at around 68 mV. Then it starts to rise again.
- At the maximum, 400 V, Vtest reached around 93 mV. Then as we left it at that voltage fell exponentially to 57 mV by 1515.
- Vtest did not wander randomly like in the first test.
Suppose we set a basic criterion that Velectrode > 90% HV. Then at HV = 300V we want Vtest < 75 mV, and at 400V we want Vtest < 100 mV.
| 1515 | Start sequence to dial HV back to 0 V |
|---|---|
| 1730 | Fill LN2 cold trap full. MB = 90.2% |