2022/06/04 (Saturday)
- Lab in-personnel: Giulia
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1048 | MC/Coldplate = 28.3/145 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 140/135 mbar, 1K Pot = 45° / 1.55 K / 8.5±0.5 mbar, MB = 73% |
| 1056 | Fill LN2 cold trap bath. |