2021/02/18 (Thursday)

Previous Day

  • Lab in-person: Matt
  • Virtual partner: Zach, Derek
Status Run 74 cooldown. Initial LHe Transfer yesterday
1150 Matt enters lab.
1150 MB = 64.2% / 178 mbar+1atm
1155 MC(Cernox)/Sorb/1K Pot = 4.77/8.4/6.63 K. G1(fridge) = 556 mbar (3He pump off).
1155 Turbo on IVC = 4.6 nbar. With turbo valved out for 1 minute, IVC = 63 nbar. Open Turbo valve again, we'll keep pumping on IVC.
This is worse than last time, Oct 8. There were hints yesterday that helium leaked into the IVC late in the transfer. We'll see whether we can cool to 1K.
1305 Pump out line leading to 1K Pot with scroll pump. Then switch over to 4He pump. Turn on 4He pump then change pump exhaust to recovery and open valve to recovery lines.
1310 Check pressure in 1K Pot (open 1K Pot speedivalve with V4a closed): Mechanical gauge = 0.35 bar. 1K Pot temperature dips to 4.8 K, then up to 5.3 K.
Note: with V4a open and 4He Pump valve closed, the pressure reads lower, 0.27 bar.
1315 Pump out 1K Pot in steps, alternating between V4a and the 1K Pot speedivalve, keeping P2 below 10 mbar, opening V4a for short bursts when necessary. After 6 speedivalve iterations leave V4a and 1K Pot speedivalve open. 1K Pot → 3.4 K / 1.2 mbar. Sorb falls, MC unaffected.
1320 MC(H35)/Tower = 4.81/4.61 K. (Coldplate/Still = 2.537/2.693 kΩ = 17.7/6.1 K. These don't have good calibrations here.)
1325 MC(H35)/Sorb = 4.81/4.2 K. G1 (fridge) = 530 mbar and falling.
1325 Open 1K Pot needle valve → 10°. 1K Pot → 2.8 K / 12 mbar.
Open 1K Pot needle valve → 20°. 1K Pot → 2.5 K / 20 mbar. MC(H35) → 3.3 K
looks good so far [image not archived: smile.svg]
1335 Open 1K Pot needle valve → 30°. 1K Pot → 2.1 K / 36 mbar, oscillating.
1335 Fill LN2 cold trap bath
1340 1K Pot = 1.8 K / 36 mbar. MC(H35)/Sorb = 2.93/4.0 K, G1 (fridge) = 268 mbar
1400 1K Pot pressure has fallen to 13 mbar, bouncing a little. MC = 2.09 K, I guess it's now below the lambda point. Actually, last time at 2.07 K the Still pressure and temperature shot up. Getting close to that point now, maybe.
1405 MC(H35)/Tower = 2.06/2.05 K. Coldplate/Still = 3.38/3.42 kΩ =? 2.84/2.07 K.
1410 Open 1K Pot needle valve → 40°. MC = 2.05 K, seems kinda stuck at the lambda point, 1K Pot low…
1413 1K Pot pressure shoots off-scale, then falls again, to around 60 mbar, bounces to 150 mbar, oscillating.
1415 1K Pot = 1.73 K / 100 mbar, oscillating. MC(H35) = 2.05 K, G1 (fridge) = 57.0 mbar.
1430 MC finally falls a bit
1430 1K Pot = 40° / 1.73 K / 100±20 mbar.
1430 MC(H35)/Tower = 1.99/1.96 K, G1 (fridge) = 56.2 mbar.
1445 Planning the DCRC setup. Found an ODB file from Run67 on 2018 Apr 1 (run28468.odb) and copied those settings, specifically trace lengths and LED settings. Plan is DCRC1/2+acc → DCRC50(3)/55(1)
Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → DCRC50(3)/55(1).
1455 Power up the DCRCs. Note: later we'll try DCRC33(2) for HV biasing. For now it's just the two DCRCs. I have shorted the HV lead so that Side2 is grounded, so we can bias with the DCRCs themselves in the standard way.
1505 Try starting MIDAS. On the first try I couldn't get the programs to all start with both DCRCs enabled, but I got it going with only DCRC3 enabled, and the SQUIDtuningGUI.exe Pulse Viewer works, can see charge traces.
1510 After screwing around a bit got the DAQ programs started with both DCRCs enabled. Can see all four charge traces.
1515 Apply 6V bias to all 4 channels and mess a little with triggering. Seeing some pulses - good.
1520 1K Pot = 40° / 1.73 K / 90±10 mbar.
1520 MC(H35)/Tower = 1.89/1.84 K, G1 (fridge) = 49.3 mbar.
1540 Matt exits lab
1625 1K Pot = 40° / 1.73 K / 85±10 mbar. MC(H35) = 1.88 K, G1 (fridge) = 49.7 mbar.
1630 Close V3 and V9, leaving 32 mbar (G2) in the dump. Turn on 3He pump.
1630 Start circulation through Trap 2. V6 → 11.6%. Condenser peaks at 158 mbar. (G2 peaks higher than G1.) MC falls to 1.58 K. 1K Pot spikes then settles.
1635 V6 → 12.0%. Condenser peaks at 123 mbar.
1640 V6 → 12.4%. 1K Pot spike. Condenser peaks at 157 mbar. P1 (Still) falls, → 30 mbar. MC → 1.35 K
1645 V6 → 12.6%. Condenser peaks at 116 mbar. Still → 5.5 mbar. MC → 1.14 K
1650 V6 → 12.8%. Condenser rises relatively slowly, peaks at 139 mbar. Still → 5.5 mbar. MC → 1.16 K. It rose a bit but is now falling again (maybe going through Al s/c transition, should be mild compared to when we are using an external Al electrode)
1655 MC goes up and down a couple times, 1.14-1.18 K
1700 V6 → 13.0%. Condenser rises slowly, peaks at 128 mbar. Still → 4.0 mbar. MC sinking, → 0.72 K
1705 V6 → 13.4%. Condenser peaks at 131 mbar. Still → 2.8 mbar. MC → 0.59 K
1710 V6 → 13.8%. Condenser peaks at 131 mbar. Still → 1.6 mbar. MC → 0.35 K
1715 V6 → 14.2%. Condenser doesn't rise. Still → 0.95 mbar. MC → 0.26 K
1720 V6 → 15.0%. Condenser → 115 mbar. Still → 0.55 mbar. MC → 0.21 K
1730 V6 → 100%. Condenser peaks at 101 mbar. Still → 0.20 mbar. MC → 0.11 K, dropping faster
1745 MC(H35) = 41 mK, Still = 0.140 mbar, G1/G2 = 79/74 mbar.
1750 Open V14 to let the remaining mix out of the dump and into circulation. P1(Still) peaks at 70 mbar then falls again. MC(H35) peaks at 85 mK. Condenser peaks at 110 mbar.
1815 MC(H35) = 34.9 mK, Still = 0.800 mbar, G1/G2 = 77/71 mbar.
1815 Close V14
2030 MC(H35) = 31.6 mK, Still = 0.140 mbar, G1/G2 = 77/72 mbar.