2017/11/13 (Monday)

Previous Day

Status: Fridge reassembled with 600 mK rod re-installed. All mixture recovered to dump. 1K Pot needle valve closed. Trap 1 and fridge pumped out. Cryostat vacuum jacket pumped out.
0915 Begin tying down LED wires to tower connector spool.
0935 Finish attaching 30 mK can adapter ring to tower. Polished all the thermal contact surfaces with ScotchBrite.
0940 Quick tower electrical check: all connected phonon channels are good, no phonon shorts to chassis, all four LEDs show voltages. Tower thermometer good.
1045 Tower installation: finish 30mK stage
1145 Tower installation: finish 100mK stage
1249 Tower installation: Polish 600mK rod and tower ear before connecting them. Finish 4K shield. Install DIB1 SQUET.
1320 Electrical check at breakout box for DIB1: everything OK except pD Feedback/return reads open. Probably stripline #19 lost another one.
1520 Verify that Stripline #19 has a break in the pD Feedback Coil trace (that's Pin 17 on the SQUET side).
Rather than fix it, we'll try swapping Stripline #19 over to DIB3, because DIB3pD is not a connected channel.
1535 Begin cryocleaning mixture through Trap 2. V6 is open to 12.8%.
1535 DIB3 SQUET is installed (with Stripline #19)
1550 Circulation stopped, increase V6 to 13.1% to reestablish flow
1555 DIB3 passes electrical check
1605 Circulation stopped, increase V6 to 13.2% to reestablish flow
1610 DIB4 passes electrical check
1620 DIB1 passes electrical check
1620 Stop cryocleaning through Trap 2 after 45 minutes
1630 After pumping out Trap 2, remove it from bath to let it warm to room temperature
1708 Tower installation: Install all SQUETs and heat sinks, close up IVC.
1715 Begin pumping on IVC with scroll pump.
1745 Pumping pressure reads 7.6e-2 mbar, switch to turbo pump.
1759 Pumping pressure reads 1.6e-3 mbar

Next Day