UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220207

2022/02/07 (Monday)

Previous Day

  • Lab in-personnel: Matt, Shubham, Himangshu
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board+extra_board/nothing → HVboard CONN1/2/3 → HV1/2 → DCRC55(1)/50(3)
Lead shield in place. Am Source y = 30.03 mm
1045 Goldman/Tower/MC(H35)/Coldplate = 41.2/71.5/32.5/181 mK, Still = 1.39 K / 0.110 mbar / 0 mW, G1/G2= 269/241 mbar, 1K Pot = 1.60 K / 11±1 mbar, MB = 34.3%
1255 Fill LN2 cold trap bath.
1430 Check Side1-HV/Side2-Readout HV board wiring. All good. Side1 Charge Channels have resistors removed so they are open.
1605 Begin LHe transfer @ MB = 27.0%
1639 End LHe transfer @ MB = 89.5%

Some observations about the Side2-readout HV board:

  • Cables will plug in in the same order as with the Side1-readout HV board
  • The detector's LEDs are connected to Cable 2, but unfortunately this connects to CONN1 which (on the Side2-readout HV board) leaves LEDs open. (This could be modified in the next tower build. Or, perhaps temporarily, we could use jumpers on the board to connect these to one of the output connectors.

Next Day