| Status | Run 74 prep. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. Cryostat vacuum jacket pumped out. IVC sealed and pumping overnight. |
| | Tower installed yesterday, turbo pumping IVC overnight. |
| 1550 | Matt enters lab |
| 1555 | Turbo on IVC = 40 nbar |
| 1600 | Quick electrical check at breakout box on both DIBs. Everything looks OK. |
| 1610 | Tighten IVC bottom screws some more. |
| 1630 | Take down clean tent and store it in pump alley |
| 1645 | Check contents of warm LN2 Trap 1/2: 27/4.8 mbar. Pump out both with Scroll Pump |
| 1710 | Check fridge pressures: LHe trap/Condenser/Still = 58.0/0.5/0.8 mbar. Pump out with Scroll Pump |
| 1650 | Warm up leak detector and connect to IVC, valve out Turbo pump. LD settles around 6 pbarL/s. Squirt helium at all IVC joints, above and below fridge stand. No increase in leak signal, surprisingly not even at the stripline elbow. |
| 1715 | Matt exits lab |