Status Run 78 beginning, LN2 transfer day before yesterday and refilled yesterday, mixture in fridge
1040 MC(Cernox) = 77.13 K, Sorb = 121.6 K, G2/G1/P1 (circulation) = 587/535/(maxout) mbar
1040 IVC = 22 nbar, Kept pumping with turbo overnight in the hope that the leak detector will read lower levels today. IVC with Turbo valved out= 300nbar.
1048 Fill LN2 cold trap dewar
1054 We will keep the leak detector on the IVC, but the levels are too high to conclude anything, so we will use the other technique to monitor IVC pressure during the LN2 blowout
1117 Pump IVC with Leak Detector, with turbo= 77 pbar L/s, Turbo valved out, IVC = 450 pbarL/s. This is within range ! Keeping turbo pumping overnight seems to have helped
1130 Begin blowing out LN2 (following Blow Out Liquid Nitrogen). Main bath (G3) → 270 mbar+1atm
1138 IVC = 440 pbarL/s, MB = 268 mbar+1atm
1153 IVC = 430 pbarL/s, MB = 300 mbar+1atm
1211 IVC = 427 pbarL/s, MB = 153 mbar+1atm
1254 IVC = 467 pbarL/s, MB = 110 mbar+1atm , flatenned.
1256 LN2 blowout is complete. G3 at 110 mbar and stable. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line.
Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then plug the transfer stick. Now you will check to see if the MB is empty. You are going to pump on the MB with the scroll pump.
1312 IVC = 450 pbarL/s
1320 Start pumping out main bath with scroll pump. Open V4A and V1A and slowly open the scroll pump valve.
1330 P2 started lowering from maxed out value.
1331 IVC = 440 pbarL/s
1338 P2 seems to be stuck at 80 mbar which implies there is more LN2 in the Main Bath. Stop pumping on Main Bath, reconnect the LN2 hose to the transfer stick, pressurize it with He gas .
1403 IVC = 400 pbarL/s. MB = 415+1atm
1417 IVC = 397 pbarL/s, MB = 410 mbar+1atm
1431 LN2 blowout is complete. G3 at 100 mbar and stable. Close the He gas supply and the valve on the gas line.
1437 Start pumping out main bath with scroll pump. Slowly open the scroll pump valve.
1446 Open scroll pump fully, P2 falls in range soon after
1505 P2 = 0.7 mbar, stop pumping on main bath by closing the scroll pump valve and turning off the scroll pump.
1510 Pressurize MB with helium to 110 mbar above 1 atm.
1514 remove the transfer stick and put stopper on that port. Replace the other port stopper with the copper stopper.
1518 Isolate MB by closing V1a. Pump out line to the G3 volume with Scroll Pump. Isolate pump, then open 1K Pot speedivalve to check pressure: didn't see the mechanical gauge move much, P2 went to 120 mbar. Then pump out 1K Pot (needle valve closed) with Scroll Pump to 0.026 mbar on P2. Then close 1K Pot speedivalve and V4a. Open V1a again to monitor bath pressure, G3 = 157.2 mbar.
1525 Close and turn off leak checker. Let 86 μbar He exchange gas into IVC (very carefully).
1540 Begin initial LHe transfer @ MB = -1.0%
3He pump off
1555 Not seeing cooling yet, pause the transfer to add a little more exchange gas.
1557 MC(Cernox)/Sorb = 76.5/126.2 K, IVC = 100 μbar, G1(fridge) = 582 mbar. G3(MB) = 147 mbar+1atm
1600 Helium cylinder ran out, replace it
1609 MC(Cernox)/Sorb = 76.1/124.7 K, G1(fridge) = 581 mbar. G3(MB) = 572 mbar+1atm
1613 Starting to see some minor cooling, IVC = 1 ubar, seems to vary quite a lot from one minute to the next
1619 Still not seeing much cooling, add a little more exchange gas
1622 Transfer pressure getting a little low, increase the cylinder pressure
1623 MC(Cernox)/Sorb = 75.8/120.3 K, G1(fridge) = 557 mbar. G3(MB) = 420 mbar+1atm
1625 Level meter starting to read but no cooling. Add a little more exchange gas again, G3 is steadily rising, pause transfer so the pressure doesn't rise too high, getting to 800mbar now
1630 Starting to see actual cooling, wait until G3 settles down more, level meter went back down to 0
1630 MC(Cernox)/Sorb = 74.1/102.1 K, G1(fridge) = 522 mbar. G3(MB) = 768 mbar+1atm
1633 Resume transfer
1641 MC(Cernox)/Sorb = 65.3/71.1 K, G1(fridge) = 531 mbar. G3(MB) = 505 mbar+1atm
1647 Check on the helium recovery bags, level was at 90% so turn on the 2nd pump
1650 Level meter still not showing up again
1652 MC(Cernox)/Sorb = 60.1/50.1 K, G1(fridge) = 516 mbar. G3(MB) = 242 mbar+1atm
1658 MC(Cernox)/Sorb/1K Pot = 56.7/26.0/>7 K, IVC = 8.6 μbar, G1(fridge) = 454 mbar. G3(MB) = 423 mbar+1atm, MB = 19.5%
1720 MC(Cernox)/Sorb/1K Pot = 43.8/7.3/5.88 K, IVC = 8.6 μbar, G1(fridge) = 445 mbar. G3(MB) = 530 mbar+1atm, MB = 73.2%
1723 MB = 71.9% it has dropped so start to end transfer
1732 End LHe transfer @ MB = 62.8%
1748 MC(Cernox)/Sorb/1K Pot = 20.8/6.2/4.99 K, IVC = 8.6 μbar, G1(fridge) = 481 mbar. G3(MB) = 181 mbar+1atm, MB = 62.8%
1755 MC temp hit 10 K, open turbo to IVC. IVC pressure hit 1.4e-4 mbar after about a minute.
1800 MC(Cernox)/Sorb/1K Pot = 4.35/5.5/4.45 K, IVC = 74 nbar, G1(fridge) = 486 mbar. G3(MB) = 159 mbar+1atm, MB = 60.2%
1801 Close V1a

Blow Out Liquid Nitrogen

Now you are going to pump out the LN2 that was used to cool the fridge to 77 K. The LN2 is going to get pushed out of the MB with He gas, and while this is happening you will monitor the helium leak rate.

  1. Turn on the leak checker and let it warm up for 20 minutes. Once warmed up, calibrate the leak checker.
  2. Connect leak checker to IVC. First, evacuate the line connecting the leak checker to pumping manifold first (using the scroll pump), and then open the valve connecting to IVC. Take a background reading. Note it in the run diary.
  3. Remove the rubber stopper from the transfer stick and attach the rubber hose to the transfer stick (as you did previously when preparing for the LN2 transfer). Make sure that the transfer stick hasn't moved vertically at all. We want it to be < 1/8“ from where it hit the transfer cone. If the transfer stick is not within the cone, you won't be able to remove all of the LN2.
  4. Attach a short metal transfer stick to the other end of the long rubber hose and insert this into a bomb dewar (holds 25 L).
    1. Make sure there is room for the hose to wiggle (and contract) when it's become frozen by the LN2.
    2. Make sure there is an extra bomb dewar close by in case the first one fills up.
  5. Seal the end of the He recovery line (where it connects to the top of the fridge) with a KF-25 blank.
  6. Make sure the He recovery valves on the wall are closed.
  7. Make sure all the valves on the right-hand side of the IGH are closed. Open the He gas cylinder. Open the He gas valve on the wall near the IGH - there should be a hose from this port to the vent inlet.
  8. Make sure that the manual valve on the 4He pumping line is closed and that the 1K Pot speedivalve is closed.
  9. Open the vent speedivalve, then open V2a, V5a, V4a, and V1a.
  10. Check - is the leak checker reading the background of the IVC? Did you record the background rate?
  11. Remove the blank from the end of the He recovery line. Allow helium to flow through for several seconds to purge the line. Then connect the recovery line to the main bath port at the top of the fridge.
  12. You are now pressurizing the main bath with helium gas. This should push LN2 out of the main bath. The rubber hose will get cold and stiff.
  13. Monitor G3 and make sure it doesn't go above 350 mbar. If it does, slightly close the regulator valve on the He gas tank and monitor the change.
    1. The reason you closed the large speedivalve on the He-4 pump is to protect it during this process. If the valve is not closed and the pressure of the gas goes above 400 mbar, the pressure from the gas in the line will cause oil to be pushed out of the He4 pump. This is a MESS to clean up and recover from. (outdated: we now isolate the pump with a manual valve.)
  14. LN2 will begin to flow out of the MB and into the bomb dewar. This process should take about 1.5 hours; keep monitoring the leak rate throughout this time. Be ready to switch bomb dewars.
  15. When the pressure reading in G3 drops significantly, the LN2 is almost completely out. Check the leak rate and record this value in the run diary.
  16. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line. Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then remove the transfer stick and plug the fridge port. Now you will check to see if the MB is empty. You are going to pump on the MB with the scroll pump.
  17. Open V4A and V1A.
  18. Turn on the scroll pump and open its inlet valve a small amount until it starts making noise. You are now evacuating the MB, continue to slowly open the scroll pump until P2 reads less than 1 mbar.
  19. If the pressure of P2 is not less than 1 mbar, you have LN2 left in the main bath. The reason for this could be that the transfer stick is too high or that you actually ran out of He-4 gas to push out the LN2. Check the positioning of the transfer stick and the amount of He-4 gas left in the gas tank. Once you have found the cause for the LN2 not being pushed out and corrected it, you will need to re-start the flow of He-4 gas to the MB.
    1. Isolate the main bath (close V4A and V1A).
    2. Open the valve on the He-4 gas tank. Make sure the valve on the copper gas line is closed.
    3. Evacuate the clear hose leading to the valve on the gas line by opening V2A and V5A (as you've done before).
    4. Close V4A and V1A.
    5. Open the He-4 gas valve on the gas line.
    6. Turn off the He-4 pump.
    7. Go to the pump room and close the large speedivalve on the He-4 pump.
    8. Open V2A, V5A, V4A.
    9. As before, open V1A when the pressure goes above 70 mbar, but make sure it doesn't rise too high.
    10. Hopefully you will see the hose start to cool, which means more LN2 is being blown out. When the hose becomes limp again, you can stop the He gas flow and stopper the transfer stick. Repeat the test of evacuating the MB with the He-4 pump (described in previous steps) to make sure all of the LN2 is out. Make certain that when you are ready to pump with the He-4 pump that the large speedivalve on the pump is opened. When conrmed that there is no LN2 left in the MB, continue to the next step.
  20. At this point the MB is being pumped on by the He-4 pump and you've confirmed that all of the LN2 is out. Isolate the He-4 pump and flush the MB with He-4 gas. This step is necessary to remove the LN2 transfer stick from the MB because we don't want air to rush in and freeze when you unplug the exhaust port. If you need to remind yourself how to do this, review section in appendix on how to pump and flush the MB.
  21. Confirm that the He-4 gas supply is off. The main bath should be full of He-4 gas.
  22. Remove the LN2 transfer stick and replace the plug into that exhaust port.
  23. Evacuate the MB again. This must be done before the LHe transfer (review explicit instructions to do so in the `Pump and Flush MB'section in the appendix).
  24. If necessary, you can use the recovered LN2 to fill the LN2 cold trap. See the appendix on how to do so.