Status Run 74 in progress. Warmed up to fix IVC leak. Cryostat vacuum jacket pumping overnight. N2 in IVC.
0930 MC(Cernox) = 277.6 K (40 F). With CVJ pumped out it's rising much more slowly, 0.14 K/hour. Suggests tau_warming of 130 hours, around 5X larger than when there's gas in the CVJ.
1030 Matt enters lab
1030 Turbo on CVJ = 19 nbar. With Turbo valved out for 1 minute, CVJ = 190 nbar.
1040 IVC = 0.55 bar. Start gently pumping out IVC with Scroll Pump
1050 Start pumping IVC with Turbo Pump
1100 Remove all small, medium, and large Main Bath bolts
1110 Remove covers from main bath pit
1120 Lower Main Bath into pit
oops - the string holding the fastener at the end of one of the cables broke, and I dropped the fastener into the pit. This will be a fun retrieval project…
1130 OK got the fastener out. Ball of paper towel duct taped to the end of the broomstick, then an inside out layer of duct tape over the end.
1135 Replace covers on main bath pit
1140 Pump IVC with Leak Detector and valve out Turbo. Signal settles around 27.0 pbarL/s.
1145 Squirting helium around the indium seal at the base of the stripline tube causes an increase in signal, but I think it's just drifting up to the stripline elbow. I can get just as much or more increase in signal by squirting way up above the indium. Repeat with indium seal at top of IVC, also no significant signal. So these semi-permanent seals don't seem to have suddenly gone bad.
1150 Squirt helium around the lower IVC seal, doing 1/8 of the circumference at a time then looking at the LD. Never goes up more than 2 pbarL/s. Guess we can't see the leak when warm.
1155 Begin slowly filling IVC with N2
1205 Erect clean tent, start HEPA fan, clean inside with methanol
1215 Remove all but two IVC bolts. IVC is now at 1 atm. I'll take a break before opening it.
1250 Remove IVC bottom
1300 Examine bottom rim of IVC. Couldn't see any scratches. Polished the surface a bit with Scotch Brite along the entire circumference, taking care to polish in the tangential direction. Noticed grease on the surface of the bottom piece under the indium, likely used more grease than necessary last time. I'll use less this time.
1325 Put new indium o-ring on bottom of IVC. Less grease - put a little on a wipe, then ran the indium through it, then ran the indium through a dry wipe to remove any excess.
1335 Attach IVC bottom, inserting several bolts and tightening until the indium is just touching but not compressing it yet. We'll do a quick electrical check to make sure everything is ok.
1345 Quick electrical check on DIB1/2 (Cable 2/3), all looks good, consistent with 2021 April 13.
1355 IVC bolts all partially tightened. Start gently pumping out IVC with Scroll Pump
1410 IVC < 0.1 mbar, switch to pumping with Turbo Pump. Continuing to tighten IVC bolts.
1425 Turbo on IVC = 0.63 μbar. Bots are pretty tight now.
1430 Pump on IVC with Leak Detector and valve out Turbo. Signal settle around 21 pbarL/s. A little lower than earlier today, that's promising.
1435 Squirt helium around bottom IVC seal. No increase in leak signal, good.
1440 Remove clean tent and store it in pump alley
1445 Squirt helium near stripline elbow. Leak signal spikes to 200 pbarL/s.
1450 Put a ring of Q-compound on the bottom side of the fridge insert top plate, around the stripline tube where it goes through the top plate. This probably won't help with the leak, and the Q-compound won't work well when it gets cold, but what the heck, I haven't tried this before.
1455 Put duct tape around the stripline elbow, except in the front where the bolthole is - can finish it up after raising the main bath.
1505 Tighten IVC bolts a few more times.
1515 Put fill funnel back on fridge, then remove covers from pit.
1530 Raise Main Bath
1530 Put covers back on pit
1550 Insert medium (bottom) and large (top) bolts attaching MB to fridge stand. Again, the small bolts which attach the fridge insert to the MB aren't aligned well. I'll try loosening the three brackets again to line up the holes better.
1605 After loosening everything a little, finally able to get the small bolts started
1625 OK, finally got everything tightened.
1630 Finish putting duct tape around stripline elbow
1640 Turbo on IVC = 100 nbar
1640 Matt exits lab