UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170211

2017/02/11 (Saturday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/2/1 → cable 3/2/1 →gender changer 3/2/1 → DCRC55(1)/33(2)/50(3) (on/on/off)
1402 Fill LN2 cold trap full.
1402 Tower/MC/Coldplate = 34.9/29.8/195 mK, Still = 1.29 K / 0.110 mbar, G1/G2 = 182.5/173.9 mbar, 1K Pot = 1.687 K / 28 mbar, Main bath = 30.3%. Boil off rate: a bit faster than slow mode.
1411 Start LHe transfer (MB = 29.6%).
1445 Finish LHe transfer (MB = 94.0%).
1450 Tweaked 1K pot pressure to 32 mbar.
1500 Release pressure from MB.
1545 Re release pressure from MB.

Next Day