2023/10/04 (Wednesday)

Previous Day

  • Lab in-personnel: Zach, Himangshu
1522 Check contents of warm LN2 Trap 1: 11.7 mbar. Pump it out with the scroll pump.
1525 G1 = 2.6 mbar and stable, stop pumping on trap 1.
1528 Insert cold trap 1 into the LN2 bath, fill bath
1528 Turn on the 3He pump
1528 Begin cryocleaning through cold trap 1 following procedure Cryo-Clean Mixture
1530 Open V6 to 11%
1534 Open V6 to 11.9% to restart flow
1542 Open V6 to 12.1% to restart flow
1640 Stop cryocleaning through cold trap 1, pump mixture to dump
1652 G1 = 1.6, P1 =.13 mbar, close all valves, leaving 712.2 mbar in the dump
1654 Turn off 3He pump and pull cold trap 1 out of the LN2 bath
1624 Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 41
SC: none 300 K 300 K
Face: 5 Date 10/04/2023
SQUET: ZC-70 Cable 2
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k — k OK
SQUID bias B/Ret 19 34 4.276 k OK
SQUID bias C/Ret 8 24 4.554 k OK
SQUID bias D/Ret 23 39 5.046 k OK
Feedback A/Ret 37 21 15 - 25 k 29.11 k OK
Feedback B/Ret 2 18 25.37 k OK
Feedback C/Ret 41 25 28.10 k OK
Feedback D/Ret 22 6 34.17 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 OL,87.1,OL, OL, OL OK
QET B/Ret 35 29, 33, 47, 48 75.3, 75.3, OL, OL OK
QET C/Ret 7 5, 9, 10, 28 83.3, 77.7, OL, OL OK
QET D/Ret 38 36, 40, 43, 44 74.2, 74.9, OL, OL OK
QET A/QET B 3 35 1000-3000 917 ohm
QET A/QET C 3 7 753
QET A/QET D 3 38 2154
QET B/QET C 35 7 5844
QET B/QET D 35 38 2073
QET C/QET D 7 38 1915
LED 1 chassis 42 1.0 - 1.1 V 1.105
LED 2 chassis 26 1.69
Motor Coil 1 pBr3 pBr4 7.53 k
Motor Coil 2 pCr3 pCr4 7.47 k
Near Endstop pAr3 chassis 5.714 k
Far Endstop pAr4 chassis 22.49 k
Thermometer ROX pAr1 pDr4 1.133 k