UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190828

2019/08/28 (Wednesday)

Previous Day

Setup DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer ?/3/2 → HVConn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)
DCRC33(2) → 1kV power supply → HV input

NaI B → DCRC50(3) pB
Lead/poly shield erected, south wall partial lead only (with NaI detectors).
PuBe source in lab.
0936 Fill LN2 cold trap bath.
0937 Tower/MC/Coldplate = 39.4/30.7/201 mK, Still = 1.27 K/ 0.085 mbar / 0 mW, G1/G2= 103/103 mbar, 1K Pot = 1.62 K / 20 mbar. MB= 68.2%
0940 Start a sequence of 8 @ 34 min series at HV = 180→327V, rate 4.31V/min, with 10% prebias for 2 minutes, flash at end with 30 min wait.
CDMS detector: Driver Gains = 1x, DCRC4/1 QET biases = (490/400/495)/(420/480/450) uA, Front-End Gains = (2/2/3)/(5/5/5)
1000 BOR, 5Hz InRun randoms, trigger on DCRC1pD threshold = 6, baseline/sample length = 120/28 (standard 16/5), phonon pre-pulse 500 (standard is 500).
NaI detector: 800 V → NaI B (dynode terminated) → PS776 → Lecroy 628 Fan In/Out → Ortec 452(Neg input, G=100, shaping=6us, -10V output) → DCRC3 PB, Driver Gains = 1, PhononWaveFormLength = 1024 (512 samples), PhononPrepulseSamples = 512 (512 samples)
Use sequence HVdrift_8X180V_4p31VPM_loopversion_prebias_10_2_dur_34min_flashDCRC_1_4.msl
1900 Fill LN2 cold trap bath.

Next Day