2017/08/29 (Tuesday)
| Status | IVC open, 4K disassembly finished. Both LN2 traps warm and pumped out. Mixture in dump (LHe cold trap isolated at around 20 K). 1K Pot needle valve open. Cryostat vacuum jacket pumped out. |
|---|---|
| 1600 | De-install tower. Disassemble clean tent in preparation for 150mm can replacement. |