2024/02/12 (Monday)
- Lab in-personnel: Himangshu
| Status | Did a 10K pumpout to see if we can lower down the G1/G2 pressures. Begin another cooldown but couldn't complete as G1/G2 pressure increased linearly |
|---|---|
| 1600 | Fill LN2 cold trap dewar |
| Doing a throughput test to see if we need to change LN2 cold trap 1 | |
| 1602 | Pump mixture to dump. Start 3He pump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1630 | G1 = 0.4 mbar, P1 = 0.060 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6 |
| 1632 | V6 is fully closed, close V9, leaving 550.3 mbar in the dump. Leave 3He pump on. |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13a, V12a+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
- Close V12a+speedivalve and V3, immediately open V1
- monitor G1
| 1638 | Perform mixture throughput test at MC = 3.1 K using above procedure with 3He pump on. Let G1 rise to 568 mbar before Step 3, then it falls to 4 mbar, then rises. Throughput = 0 mbar/min. |
|---|---|
| 1640 | Open mixture to both sides of the fridge (V3) and cold LN2 Trap 1 (V12a+speedivalve). |
| 1645 | Change over to Cold Trap 2 now. |
| 1646 | Pump mixture to dump. Start 3He pump. Close V13a, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1705 | G1 = 0.4 mbar, P1 = 0.1 mbar. Stop pumping mixture to dump. Close V12a+speedivalve, close V1, close V3, close V6 |
| 1707 | V6 is fully closed, close V9, leaving 580.7 mbar in the dump. Leave 3He pump on. |
| 1708 | Pump out LN2 Cold Trap 2 first. |
| 1730 | Doing a throughput test to see if we can use LN2 cold trap 2 |
|---|---|
| Throughput test procedure, Cold Trap 2: |
- All mixture in dump, LN2 trap 2 cold, condenser & still valves open (3He pump on - optional)
- Open V9, V13b, V12b+speedivalve, V3. Wait for G1 to be close to G2 (within 100 mbar).
- Close V12b+speedivalve and V3, immediately open V1
- monitor G1
| 1638 | Perform mixture throughput test at MC = 3.1 K using above procedure with 3He pump on. Let G1 rise to 568 mbar before Step 3, then it falls to 4 mbar, then rises. Throughput = 0 mbar/min. |
|---|
| 1640 | Open mixture to both sides of the fridge (V3) and cold LN2 Trap 2 (V12b+speedivalve). |
|---|