UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170305

2017/03/05 (Sunday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33
1406 Tower/MC/Coldplate = 33.7/30.9/195mK, Still = 1.28 K / 0.110 mbar, G1/G2 = 250/240 mbar, 1K Pot = 1.687 K / 26 mbar, Main bath = 22.5%. Boil off rate: a bit faster than slow mode (predicted level: 25.2%).
1408 Fill LN2 cold trap full.
1415 Start LHe transfer (MB = 21.9%)
1517 Pause LHe transfer (MB = 74.0%, dewar ran dry)
1536 Restart LHe transfer (MB = 70.9%)
1550 End LHe transfer (MB = 91.9%)
2032 Start 12 hour bake

Next Day