2022/05/22 (Sunday)
- Lab in-personnel: Matt
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1616 | Begin LHe transfer @ MB = 32.7% |
| 1630 | Fill LN2 cold trap bath |
| 1706 | End LHe transfer @ MB = 94.6% |