start › cdms › k100 › run_diary › 20230421

2023/04/21 (Friday)

Previous Day

  • Lab in-personnel: Himangshu, Zach
Status Run 78 Preparation. Tower Installation in progress. IVC open. Turbo valved out
Put cap on bottom hole of Tower.
1400 Check contents of warm LN2 Trap 1: 23.4 mbar (28.9 on G1). Pump it out with the scroll pump.
1405 G1 = 2.5 mbar and stable, stop pumping on Trap 1
1406 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1415 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1420 Open V6 to 12.0% to restart flow
1448 Open V6 to 12.3% to restart flow
1523 Open V6 to 12.4% to restart flow
1640 Completed installing shields for the 100mK Can. Attach Outer first, then inner shield piece. We use medium-sized screws for the heatsinks outer screw-holes, longer screws for inner screwholes of heatsinks and short screws for other screwholes to complete the 100mK shield.
1640 End cryocleaning mixture through trap 1. Pump mixture to dump
1700 P1 = 0.09 mbar, G1 = 1.9 mbar and stable. Close all valves and turn off 3He pump, leaving 725.1 mbar in dump
1702 Remove cold trap 1 from the LN2 bath to warm up overnight
1328 Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 41
SC: none 300 K 300 K
Face: 5 Date 04/21/2023
SQUET: ZC-70 Cable 2
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k — k OK
SQUID bias B/Ret 19 34 4.276 k OK
SQUID bias C/Ret 8 24 4.554 k OK
SQUID bias D/Ret 23 39 5.046 k OK
Feedback A/Ret 37 21 15 - 25 k 29.11 k OK
Feedback B/Ret 2 18 25.37 k OK
Feedback C/Ret 41 25 28.10 k OK
Feedback D/Ret 22 6 34.17 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 OL,87.1,OL, OL, OL OK
QET B/Ret 35 29, 33, 47, 48 75.3, 75.3, OL, OL OK
QET C/Ret 7 5, 9, 10, 28 83.3, 77.7, OL, OL OK
QET D/Ret 38 36, 40, 43, 44 74.2, 74.9, OL, OL OK
QET A/QET B 3 35 1000-3000 917 ohm
QET A/QET C 3 7 753
QET A/QET D 3 38 2154
QET B/QET C 35 7 5844
QET B/QET D 35 38 2073
QET C/QET D 7 38 1915
LED 1 chassis 42 1.0 - 1.1 V 1.105
LED 2 chassis 26 1.69
Motor Coil 1 pBr3 pBr4 7.53 k
Motor Coil 2 pCr3 pCr4 7.47 k
Near Endstop pAr3 chassis 5.714 k
Far Endstop pAr4 chassis 22.49 k
Thermometer ROX pAr1 pDr4 1.133 k
1441 Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2
Cooldown checkout sheet (rev C SQUET)
Detector: S104 Stripline 43
SC: none 300 K 300 K
Face: 2 Date 4/21/2023
SQUET: ZC-13 Cable 3
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.605 k OK
SQUID bias B/Ret 19 34 4.770 k OK
SQUID bias C/Ret 8 24 — k OK
SQUID bias D/Ret 23 39 4.884 k OK
Feedback A/Ret 37 21 15 - 25 k 18.85 k OK
Feedback B/Ret 2 18 19.91 k OK
Feedback C/Ret 41 25 — k OK
Feedback D/Ret 22 6 20.65 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 77.2, 72.3, 67.6, 68.7, 77.5 OK
QET B/Ret 35 29, 33, 47, 48 70.1, 70.2, 80.4, 70.1 OK
QET C/Ret 7 5, 9, 10, 28 72.2, 71.6, 60.5, 69 OK
QET D/Ret 38 36, 40, 43, 44 71.6, 69.1, 68.1, 68.5 OK
QET A/QET B 3 35 1000-3000 790
QET A/QET C 3 7 1669
QET A/QET D 3 38 1370
QET B/QET C 35 7 1796
QET B/QET D 35 38 1644
QET C/QET D 7 38 2072
1248 Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3
Note: This SQUET need to slanted to make QET B working, seems to be affected by the angle between stripline head connector with the SQUET
Detector: S104 Stripline 48
SC: none 300 K 300 K
Face: 3 Date 4/21/2023
SQUET: ZC-39 Cable 1
Signal Pos. lead Gnd lead Nominal Actual Chassis
(Gnd lead)
Nominal:
< 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.233 k OK
SQUID bias B/Ret 19 34 3.956 k OK
SQUID bias C/Ret 8 24 — k OK
SQUID bias D/Ret 23 39 — k OK
Feedback A/Ret 37 21 15 - 25 k 24.69 k OK
Feedback B/Ret 2 18 23.33 k OK
Feedback C/Ret 41 25 25.5 k OK
Feedback D/Ret 22 6 16.47 k OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 87.7, 89, 85, 86, 89 OK
QET B/Ret 35 29, 33, 47, 48 64, 64, 65, 65 OK
QET C/Ret 7 5, 9, 10, 28 63, 64, 54, 63 OK
QET D/Ret 38 36, 40, 43, 44 59, 59, 59, 59 OK
QET A/QET B 3 35 1000-3000 1735
QET A/QET C 3 7 2535
QET A/QET D 3 38 2166
QET B/QET C 35 7 2626
QET B/QET D 35 38 2243
QET C/QET D 7 38 1079
1500 Attach 100 mK shield, heat sinks.
1530 Attach screw for 600 mK rod. Begin attaching 4K stage.
1400 Finish attaching 4K stage.

Next Day