UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230427

2023/04/27 (Thursday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 78 Preparation. Tower Installation complete. IVC closed, Turbo NOT on IVC since we suspected a leak, but no leak found during leak checking
1130 IVC is at 1 mbar this morning. It was kept at 1 e-2 mbar last night (with no turbo).
1200 After discussing with Matt, we will keep the Turbo on IVC to see how low of a pressure we can go with this. During Run 76, Turbo on IVC was 86 nbar, with turbo valved out for a minute, IVC was 1 ubar

Next Day