| Status | Run 74 in progress. Warming up after second occurrence of IVC leak during initial LHe transfer. Helium in Cryostat Vacuum Jacket. Mixture in dump. |
| 0900 | MC(Cernox) = 148.4 K rising at 5.5 K/hr, implies warming tau = 26.7 hr, predicted to reach dew point Sunday at 1:00 pm |
| 0900 | Recovery meter hasn't moved since last night. MB pressure low overnight, 113-119 mbar+1atm overnight |
| 1000 | MC(Cernox)/Sorb = 154/>250 K, IVC = 190 mbar |
| 1335 | MC(Cernox)/Sorb = 171 K, IVC = ? mbar - hard to read, the display is messed up at the moment |
| 1514 | Zach arrives at lab. |
| 1520 | Took out transfer stick and closed recovery valve. |
| 1521 | IVC = 190 mbar. |
| | We're trying some tests, curious as to whether we can identify the gas in the IVC. Since we have both a mechanical gauge and the composite Pfeiffer gauge on the manifold, we may be able to identify the gas because the Pfeiffer reading is gas-dependent but the mechanical gauge isn't. So we'll compare the two gauges for the gas that's in the IVC, then also compare the two gauges using pure He or pure N2 in the manifold. |
| 1530 | Pump out manifold with mechanical gauge, open back up to IVC, digital gauge = 160 mbar, mechanical gauge = 7inHg/28 = 250 mbar |
| 1535 | Pump out a little from the manifold, digital = 120 mbar, mechanical = 3inHg/28 = 107 mbar |
| | After this we repeated these measurements with different amounts of N2 or He in the manifold. But with helium, just a little gas, too little to even read on the mechanical gauge, causes the Pfeiffer gauge to max out at 1000 mbar. The various combinations are summarized below: |