UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170405

2017/04/05 (Wednesday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33
Taking 100V data overnight
0917 Tower/MC/Coldplate = 33.6/32.8/201 mK, Still = 1.4 K / 0.120 mbar, G1/G2 = 243/225 mbar, 1K Pot = 1.689 K / 28 mbar, Main bath = 71.6%. Boil off rate: close to slow mode (predicted level: 73.2%)
HV = 100 V, V_leak = 7.2 mV, V_crystal = 96.8 V
1105 Complete IbIs of DCRC1PA.
1251 Complete IbIs on all channels at 100V, DCRC1PB, DCRC1PC, DCRC2pC, DCRC2pD.
1252 HV = 100 V, V_leak = 6.0 mV, V_crystal = 97.4 V
1255 Dial HV down to 0 V
1430 Begin 30 minutes of flashing (30 sec on, 5 sec off)
1700 Finish IbIs on DCRC2pD/DIB4pD/Side1pF. The previous QET bias of -148.9 was set to give Ib*prefac of 40 uA, but now it produces 33.6. To get 40 uA the current IbIs indicates a QET bias setting of -151.7 uA.
1705 Fill LN2 cold trap bath

Next Day