UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220620

2022/06/20 (Monday)

Previous Day

  • Lab in-personnel: Matt, Giulia
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
1010 MC/Coldplate = 29.1/152 mK, Still = 1.06 K / 0.090 mbar / 0 mW, G1/G2 = 121/119 mbar, 1K Pot = 45° / 1.51 K / 7.0±0.5 mbar, MB = 75.7
1020 Fill LN2 cold trap bath

Next Day