| – | Swapping and Reswapping things seem to have fixed the short yesterday. Installed all SQUETS and rechecking it today to start pumping on the IVC | | | | |
| 1100 | Meeting with Elliott to discuss plans for the DMC study. | | | | |
| 1200 | Electrical check on all three cables with IVC open | | | | |
| 1220 | Electrical check of ZC-70+interposer , Stripline 41 on Tower Face 5 | | | | |
| | Cooldown checkout sheet (rev C SQUET) | | | | |
| Detector: | S104 | Stripline | 41 |
| SC: | none | 300 K 300 K |
| Face: | 5 | Date | 09/30/2025 |
| SQUET: | ZC-70 | Cable | 2 |
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| | | | | | (Gnd lead) |
| | | | | | Nominal: |
| | | | | | < 0.1 nS |
| | | | | |
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | — k | OK |
| SQUID bias B/Ret | 19 | 34 | | 4.36 k | OK |
| SQUID bias C/Ret | 8 | 24 | | 4.54 k | OK |
| SQUID bias D/Ret | 23 | 39 | | 5.01 k | OK |
| | | | | | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | — k | OK |
| Feedback B/Ret | 2 | 18 | | 25.03 k | OK |
| Feedback C/Ret | 41 | 25 | | 28.00 k | OK |
| Feedback D/Ret | 22 | 6 | | 34.05 k | OK |
| | | | | | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,79.9,OL, OL, OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | | 77.3, 77.7, OL, OL | OK |
| QET C/Ret | 7 | 5, 9, 10, 28 | | 78.9, 77.9, OL, OL | OK |
| QET D/Ret | 38 | 36, 40, 43, 44 | | 79.2, 79.2, OL, OL | OK |
| | | | | | |
| QET A/QET B | 3 | 35 | 1000-3000 | 729 ohm | |
| QET A/QET C | 3 | 7 | | 755 | |
| QET A/QET D | 3 | 38 | | 1883 | |
| QET B/QET C | 35 | 7 | | 240 | |
| QET B/QET D | 35 | 38 | | 1629 | |
| QET C/QET D | 7 | 38 | | 1652 | |
| | | | | | |
| LED 1 | chassis | 42 | 1.0 - 1.1 V | | – |
| LED 2 | chassis | 26 | | | 2.29 |
| Motor Coil X1 | pBr3 | pBr4 | | 185.8 | |
| Motor Coil X2 | pCr3 | pCr4 | | 170.3 | |
| Motor Coil Y1 | pBr3 | pBr4 | | 204.8 | |
| Motor Coil Y2 | pCr3 | pCr4 | | 193.3 | |
| Near Endstop | pAr3 | chassis | | open | |
| Far Endstop | pAr4 | chassis | | open | |