UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20161125

2016/11/25 (Friday day)

Previous Day

1237 Setup: DIB1/3/4 → 3.2 MHz filters → cables1/2/3 → DCRC55(1)/33(2)/50(3)
Tower/MC/Coldplate = 33.4/35.9/232 mK, Still = 1.3 K / 110 μbar, G1/G2 = 197/172 mbar, 1K Pot = 1.7 K / 30 mbar. MB = 28.7%.
Fill LN2 cold trap full.
1246 Commence LHe transfer (27.7%)
1310 Pause LHe transfer at 56.3% as dewar ran dry (7L remaining). Resume with another Praxair dewar.
1319 Remove 88Y source from safe and place in Pb castle.
1323 Enable DCRC4 for coincident data.
1227 Start test series with Frontend Gain = 5/2/5, OG = 8/3/8, with 1000 beginning randoms, trigger on PhA of DCRC4 (NaI trigger) at 10 ADC.
1335 DCRC1 PB was railed, adjust driver offset.
1345 Cease LHe transfer (89.8%)
1353 Start sequence of 64 1-hour series of 0V coincident data with Frontend Gain = 5/2/5, OG = 8/3/8, with 1000 beginning randoms, no flashing, trigger on PhA of DCRC4 (NaI trigger) at 10 ADC.
1354 Release pressure form main bath.
1430 Release pressure form main bath.

Next Day