Setup Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs on. Lead/poly shield erected (4 lead walls, 2 poly walls).
Confusing IbIs results this morning
0740 Restart DAQ programs and flash DCRC1&4 SQUIDs
0755 Very strange behavior. DCRC1pD is behaving as though it is normal. Event though earlier this morning it had a reasonable IbIs curve with a transition.
0815 All channels are behaving as if normal except DCRC1pB and DCRC4pB. These are Side1pB and Side1pA, the outer channels.
The only thing I can figure is that helium films are now affecting the detector, warming up the phonon channels. I did see a 400 Hz sine wave in some channels at some point yesterday, which may have been a hint of helium films affecting the phonon channels.
0820 Now I'm suddenly seeing pulses in most channels. What the hell?
0830 Adjusted the QET biases in some of the channels, which now look like they are in transition. But in the process, pulses disappeared again - looks like they're acting like they've been driven normal again.
0835 Seeing pulses in all channels again. Wacky.
0955 DCRC4pB has weird IbIs. It seems to be overly sensitive to QET bias. Numerically speaking, the normal resistance appears to be about 2.7 times larger than before. hmm.
1218 Tower/MC/Coldplate = 56.7/31.9/190 mK, Still = 1.40 K / 0.120 mbar / 0 mW, G1/G2= 247/242 mbar, 1K Pot = 1.58 K / 16±2 mbar.
1000 Ruiren temperature = 36.8C
1100 Ruiren enters lab
1105 transfer lN2 into cold trap dewar
1110 Turn off DAQ programs, powercycle DCRCs.
1115 Restart DAQ programs, zap DCRC1&4 SQUIDs.
1115 started lHe transfer at 29.6%
1125 DCRC4 channels railed, can't seem to relock them. Try zapping DCRC1&4 SQUIDs again.
1142 Finished lHe transfer at 90.4%
1145 DCRC4 channels still railed. Tower temperature seems elevated too.
1205 Powercycle DCRC4 again. Still cannot get DCRC4 phonon channels to unrail. Seems like this DCRC is in trouble.
1210 Turn off DAQ programs then unplug DCRC4. We'll see how the DCRC1 channels look without DCRC4 plugged in.
1220 Ruiren leaves lab