UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180701

2018/07/01 (Sunday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
overnight: base temperature stable, 1K Pot drifting down but very slowly
1000 Tower = 30.0 mK, G1/G2 = 93/104 mbar, Still = 0.080 mbar / 1.5 mW, 1K Pot = 1.50 K / 4.0 mbar
1153 Tower/MC/Coldplate = 29.9/30.2/180 mK, Still = 1.4 K / 0.080 mbar / 1.5 mW, G1/G2 = 92/103 mbar, 1K Pot = 1.45 K / 4.0 mbar. MB = 41.4%
1215 Start LHe transfer (MB = 41.0%)
1220 Fill LN2 cold trap full.
1250 Check on channels via SQUID tuning gui. All seem to be in range and operating. The flash and take sequence used yesterday was modified to never switch off the HV power supply, but just dialled its bias down to ~0 V. This seems to have kept channels from railing and should be the way to operate from here on out.
1303 End LHe transfer (MB = 89.7%)
1306 Tweak 1K Pot needle valve open about 10 degrees. 1K Pot → 1.63 K / 32 mK
1310 Top off HPGe dewar from large N2 dewar.
1316 Start HV scan sequence of 30-minute background (+PuBe) data series at HV = 10,20,30,40,50,60,70,80 V, Driver Gains = 2x, QET biases = (280/260/305)/(135/290/300) uA, Front-End Gains = 10, 1000 initial randoms, trigger on DCRC3pB/C/D threshold = 8/16/16, flashing then waiting 30min after each series, 15% prebias for 5min, using sequencer script HVscan-10_20_30_40_50_60_70_80-15_5PreBias-30Flash-30wait-30data.msl
1710 Tower = 29.9 mK, G1/G2 = 126/128 mbar, Still = 0.080 mbar / 1.5 mW, 1K Pot = 1.45 K / 4.5 mbar

Next Day