| 1335 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 550 mbar before Step 3, then it falls to 41 mbar and starts to rise. Throughput = 6.0 mbar/min. |
| 1345 | Pump mixture out of fridge and cold LN2 Trap 1 to dump. |
| 1400 | Raise the main bath and attach with screws. Everything lined up on the first try. |
| 1410 | With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump.
Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2. |
| 1425 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1430 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1435 | Pressurize main bath and 1K Pot (both sides) with helium to 382 mbar +1atm on G3, then close 1K Pot speedivalve and needle valve. |
| 1435 | Turbo on IVC = 34 nbar. With turbo valved out for a few minutes, IVC = 860 nbar. |
| 1440 | Let 5.4 mbar He exchange gas into IVC |
| 1445 | As on 2019 Oct 29, we will flow mixture through the fridge during LN2 cooldown. Let mixture from dump through cold LN2 Trap 1 to fridge, both sides. Then we'll isolate the sides and circulate with V6 open partially and mix open to dump. V9, V13a, V12a+speedi, V1, Condenser speedi, Still gate valves open, 3He pump on. Now open V6 to 12.8%. |
| 1450 | P1 falls strangely very low, <1 mbar. Not sure why… |
| 1500 | Try closing V12a+speedi. G1 falls as it should, showing we have throughput. Falls at 11 mbar/min. Open V12a+speedi again. |
| 1500 | Circulation pressures settling to G2/G1/P1 = 660/721/0.34 mbar |
| 1505 | MC(Cernox) = 296.9 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 660/721/0.4 mbar, Level resistor = 0.985 kΩ |
| 1515 | Begin LN2 transfer |
| 1527 | MC(Cernox) = 292.0 K, Sorb = >249 K (max), IVC = 4.6 mbar, G2/G1/P1 (circulation) = 659/721/0.9 mbar, Level resistor = 1.121 kΩ |
| 1527 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 16.5 mbar/min. Open V12a+speedivalve again. |
| 1538 | MC(Cernox) = 271.5 K, Sorb = >249 K (max), IVC = 3.0 mbar, G2/G1/P1 (circulation) = 660/720/1.9 mbar, Level resistor = 1.221 kΩ |
| 1550 | MC(Cernox) = 237.6 K, Sorb = >249 K (max), IVC = 2.5 mbar, G2/G1/P1 (circulation) = 660/719/3.4 mbar, Level resistor = 1.310 kΩ |
| 1555 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 21 mbar/min. Open V12a+speedivalve again. |
| 1600 | MC(Cernox) = 206.1 K, Sorb = >249 K (max), IVC = 2.5 mbar, G2/G1/P1 (circulation) = 660/718/5.0 mbar, Level resistor = 1.34 kΩ |
| 1602 | Level resistor reading higher than expected based on previous run, pulled out and placed back in. Closed LN2 dewar valve by <1/4 turn. |
| 1610 | MC(Cernox) = 189.5 K, Sorb = 230 K, IVC = 2.2 mbar, G2/G1/P1 (circulation) = 659/718/7.5 mbar, Level resistor = 1.340 kΩ |
| 1615 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 31 mbar/min. Open V12a+speedivalve again. |
| 1620 | MC(Cernox) = 173.3 K, Sorb = 190 K, IVC = 2.2 mbar, G2/G1/P1 (circulation) = 659/718/15.0 mbar, Level resistor = 1.340 kΩ |
| 1630 | MC(Cernox) = 160.5 K, Sorb = 170 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 659/717/30.0 mbar, Level resistor = 1.339 kΩ |
| 1635 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 42.5 mbar/min. Open V12a+speedivalve again. |
| 1640 | MC(Cernox) = 150.1 K, Sorb = 150 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 659/716/45.0 mbar, Level resistor = 1.340 kΩ |
| 1650 | Stopped LN2 transfer. Pulled out Level resistor and put ping-pong ball on MB exhaust port. |
| 1650 | MC(Cernox) = 141.0 K, Sorb = 140 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 659/716/130.0 mbar, Level resistor = 1.340 kΩ |
| 1700 | MC(Cernox) = 134.9 K, Sorb = 130 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 659/716/550.0 mbar |
| 1700 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 52.5 mbar/min. Open V12a+speedivalve again. |
| 1715 | MC(Cernox) = 124.7 K, Sorb = 120 K, IVC = 1.9 mbar, G2/G1/P1 (circulation) = 659/716/(off scale) mbar |
| 1730 | MC(Cernox) = 116.8 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/716/(off scale) mbar |
| 1730 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 58 mbar/min. Open V12a+speedivalve again. |
| 1747 | MC(Cernox) = 108.8 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/716/(off scale) mbar |
| 1755 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 57.5 mbar/min. Open V12a+speedivalve again. |
| 1800 | MC(Cernox) = 104.2 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/716/(off scale) mbar |
| 1804 | Filling LN2 cold trap dewar. LN2 dewar ran out part way through filling. |
| 1815 | MC(Cernox) = 98.9 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/716/(off scale) mbar |
| 1830 | MC(Cernox) = 95.5 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/716/(off scale) mbar |
| 1830 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 58.5 mbar/min. Open V12a+speedivalve again. |
| 1900 | MC(Cernox) = 89.1 K, Sorb = 120 K, IVC = 1.6 mbar, G2/G1/P1 (circulation) = 658/715/(off scale) mbar |
| 1900 | Close V12a+speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 59 mbar/min. Open V12a+speedivalve again. |
| 1905 | Close V6 and stop circulation pump. |