  • Lab in-personnel: Himangshu
Status Did a 10K pumpout to see if we can lower down the G1/G2 pressures. Begin another cooldown
1418 Fill LN2 cold trap dewar
1419 MC(H35)/1KPot = 6.28/6.99 K . Both are at higher temperatures than earlier
1421 Turn on 4He pump. Open Recovery valve to 4He pump. Pump out line to 1K pot (open V4a, close 1K pot speedivalve and slowly open the 4He-pump inlet valve).Close the 4He-pump inlet valve once done. Check pressure in 1K Pot by opening the 1Kpot speedivalve(with V4a open, 4He pump inlet valve closed). 1K Pot = 0.23 bar ((30-23=) 7 inHg) on mechanical gauge.
1430 Pump out 1K Pot slowly, opening the 4He pump valve until it just starts to make noise, then opening it more when it becomes more quiet.
1435 Open 4He pump valve fully
1436 MC(H35) = 6.27 K, flatenned, 1K Pot = 3.39 K / 1.1 mbar, MB = 37.2% enough to start 1K Pot.
1439 Open 1K Pot needle valve → 15° (half a unit mark). 1K Pot (P2) → 3.09 K / 6 mbar
1441 MC(H35) = 6.24 K, Open 1K Pot needle valve → 30°. 1K Pot → 2.45 K / 26 mbar.
1443 MC temp dropping
1420 MC(H35)/1Kpot = 3.18/1.9 K, MC temp dropping linearly. G1/G2 = 338/318 mbar . 1K Pot(P2) = 26 mbar.
1450 We will stop the 1Kpot to do the LHe transfer to avoid putting ice inside the 1Kpot
1451
1438 MC temp is around the He transition point (2.17K), P2 = 13 mbar
1511 MC(H35)/1Kpot = 1.90/1.61 K and flat. G1/G2 = 48.6/51.0 mbar . 1K Pot(P2) = 20 mbar.
1512 Close V3 and V9, leaving 51.0 mbar mixture in dump.
1513 Turn on 3He pump
1515 Start circulation through Trap 1. V6 → 12.6%. Condenser(G1) peaks at 329 mbar. MC(H35) → 1.45 K. Still → 1.48 K / 26 mbar.
1525 V6 → 13.0%. Condenser(G1) peaks at 244 mbar. MC(H35) → 1.25 K. Still(P1) → 1.28 K / 6.0 mbar.
1530 V6 → 13.4%. Condenser(G1) peaks at 252 mbar. MC(H35) → 1.14 K. Still(P1) → 1.17 K / 3.8 mbar.
1535 V6 → 13.8%. Condenser(G1) peaks at 248 mbar. MC(H35) → 1.05 K. Still(P1) → 1.12 K / 2.2 mbar.
1540 V6 → 14.4%. Condenser(G1) peaks at 254 mbar. MC(H35) → 0.85 K. Still(P1) → 1.11 K / 1.2 mbar.
1545 V6 → 15.0%. Condenser(G1) peaks at 256 mbar. MC(H35) → 0.62 K. Still(P1) → 1.11 K / 0.75 mbar.
1553 V6 → 100.%. Condenser(G1) peaks at 257 mbar. MC(H35) → 0.24 K. Still(P1) → 1.05 K / 0.2 mbar.
1639 MC(H35) = 31.8 mK, Tower(Rox) = 64.9 mK and pretty flat, G1 = 172 mbar and pretty flat. 1K Pot = 1.61 K / 20 mbar.
1641 Open V14 to pull the rest of the mixture out of the dump into circulation.
1644 MC(H35) rises to 75 mK (Tower Rox to 89 mK), Still rises to 70 mbar then falls again, Condenser(G1) rises to 255 mbar. 1K Pot unaffected.
1733 P1 = 0.38 mbar (<1), close V14