UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210828

2021/08/28 (Saturday)

Previous Day

  • Lab in-personnel: Derek
Status Run 74 in progress. First cooldown after IVC rebuild.
Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels.
Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. Lead shield erected, 4 walls. Currently both DCRCs are on.
Position of Am source: y = 0.0 mm
1623 Tower/MC/Coldplate = 111.0/33.6/190.0 mK, Still = 1.38 K / 0.070 mbar / 0 mW, G1/G2= 293.2/272.8 mbar, 1K Pot = 1.59 K / 11±1 mbar. MB = 26.9%.
1624 Fill LN2 cold bath.
1642 Begin LHe transfer. MB = 26.9%
1718 Finish LHe transfer. MB = 89.9%

Next Day