Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
0913 Fill LN2 cold trap full.
0918 Tower/MC/Coldplate = 27.4/30.5/188 mK, Still = 1.36 K / 0.060 mbar, G1/G2 = 145/142 mbar, 1K Pot = 1.66 K / 20 mbar. MB = 30.8% (Predicted level: 31.4%)
1015 Had to reboot jiajin. Got MIDAS running, MIDAS programs running, vnc session working, SQUID tuning gui working.
1025 As on Friday it is still the case that on DCRC4, pA and pB are unresponsive. There are no pulses, and no changes with QET bias or SQUID settings or changing polarity or ADC source. They do respond to changes in Driver Gain and Driver Offset though.
1030 Turn of MIDAS programs, turn off DCRCX(4). Unplug and replug cable. Then turn DCRC on again and restart MIDAS programs.
1045 Zap SQUIDs on DCRC4(X)
1055 pA and pB on DCRC4(X) are still unresponsive.
1100 Trying DCRC50(3) for DIB4 instead. Don't know whether DCRC50 is working, probably not.
1105 Can't even get the MIDAS programs running if I enable DCRC3. Or sometimes I can get them running but then they crash when I try to start a run.
1120 Try plugging DIB4 into DCRC1, to verify that the four channels work at all. Successful test, all four phonon channels working with DIB4→DCRC1.
1145 Plug DCRCX(4) into mini-BOB. Check voltages at QET bias sockets - they seem to respond to changing settings, e.g. on pA, 50/0/200 uA → 1.3/0/5.1 mV, similar behavior to pD. Also changing the SQUID bias changes the reading on the sockets labeled A/B/C/D or TP 7/6/10/9 (not sure what these are but I do see changes). So it seems as though some pA and pB settings are functional with DCRC4. Maybe it fails to set the polarity or ADC source correctly, not sure how to check that. Maybe by monitoring on a telnet session.
1200 Establish Telnet session with DCRC4 and try varying settings using MIDAS. For all the things I tried, it seemed to work according the reading the registers. Including polarity and ADC source settings. Hrm.
1245 Start LHe transfer (MB = 24.8%)
1304 Stop LHe transfer (MB =22.2%). Dewar was overpressurized and the transfer stick froze, need to let it warm up.
1315 Try powering all three DCRCs with same setup as this morning (except I changed the gender changer on the DIB4 cable). Looks like DCRC4 pA/pB still have the same problem. pC/pD are railed. Zap SQUIDs before checking further.
1330 Restart LHe transfer (MB = 21.2%)
1417 End LHe transfer (MB = 91.9%)
1510 Estimate event rate, count 134 pulses in 1 second = 134 Hz
1600 Erect North and South shield wall frames, but didn't start putting lead in them yet.
1605 Fill LN2 cold trap full.