start › cdms › k100 › run_diary › 20170316

2017/03/16 (Thursday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33
0914 Tower = 33.4 mK, Main Bath = 49.9%. Boil off rate: close to slow mode (predicted level: 48.4%).
0915 Fill LN2 cold trap bath.
1555 Finish IbIs for DCRC1pA/DIB1pA/Side1pE. New result suggests that Ib*prefactor, previously adjusted to 40 μA, has now shifted to 35 μA. According to this new IbIs the QET bias should be adjusted from 130.2 to 132.2 μA to achieve Ib*prefac = 40 μA.
1606 Commence LHe transfer (39.6%).
1655 End LHe transfer (91.9%).
We used 2.0 PSI to pressurize the near-full 250L Dewar, and got a recovery meter rate during transfer of 5.9 cuft/min
1703 Fill LN2 cold trap full.
1709 Start sequence of 12, 1-hour data series of 1-sided 0V HV data with Frontend Gain = (20/20/20)/(-/4/3), OG = 4/2, QET biases = table above, with 1000 beginning randoms, no flashing, and a 15ADC bin threshold trigger on DCRC1 pA